The Tanfield Waggonway
In the seventeenth century coal was being mined in the ground south of theThe Causey Bridge
The "Old Way" of the Tanfield Waggonway was north of Bryan's Leap, but it was extended southwards, forming the majority of the later network, in 1725 - 1727. It crossed the Beckley Burn near Causey by the Causey Arch, to reach Dawson's Drift colliery; this is often referred to as the world's oldest railway bridge.G F Whittle, ''The Railways of Consett and North-West Durham'', David and Charles, Newton Abbot, 1971, Sykes described the bridge in 1833:Tanfield Arch, in the county of Durham, a remarkable structure, was built by Colonel Liddell and the Hon. Charles Montague, the founders of the partnership now vulgarly called the Grand Allies, to obtain a level for the passage of coal-waggons. It is frequently called Cawsey Bridge, from its being built over the deep and romantic dell of Cawsey burn, near Tanfield. The span of the arch is 103 feet; it springs from abutments about nine feet high, and being semicircular, the entire elevation is above 60 feet; it cost £12,000. The architect was Ralph Wood, a common mason, who, having built a former arch of wood, that fell for want of weight, committed suicide from a fear of this beautiful structure experiencing a similar fate. On a sun dial, on one of the piers, is the following: "Ra. Wood, mason, 1727". This arch was built for a waggon-way to a colliery, which was set on fire, and has long been unwrought. It has been many years neglected, and is falling to ruins.John Sykes, ''Local Records, or Historical Register of Remarkable Events'', published by John Sykes, Newcastle, 1833The engineer M F Barbey is more accurate on technical detail:
Reputed to be the oldest 'railway' bridge in the world ... claimed to be the fifth largest span masonry bridge in Britain, even todayThe Causey Arch carried trains until that branch closed in 1962.981 Year 981 ( CMLXXXI) was a common year starting on Saturday (link will display the full calendar) of the Julian calendar. Events Births * Abu'l-Qasim al-Husayn ibn Ali al-Maghribi, Arab statesman (d. 1027) * Giovanni Orseolo, Venetian ..., it remained the largest stone span for 30 years ... the arch so of semi-elliptical form, 35 ft high from springing to soffit, with a span of 105ft, its height is 80ft and it would seem to have been designed to carry a double track.M F Barbey, ''Civil Engineering Heritage: Northern England'', Thomas Telford, London, 1981,
Traffic on the waggonway
Traffic on the Tanfield waggonway was heavy. A year after opening a third track was required: nonetheless the old main way was worn out in four years. Gabriel Jars reported:The longest road belongs to a very rich company, which Lord Bute, a former minister, is one of the main proprietors. This company is not only the owner of the Royalty of several mines, but it leases many others on the route. Evidently it extracts considerable volumes of coal, because the line is almost always covered with wagons. The company has spared no expense in arranging easy operation and reaching the market for the mineral it extracts."Le chemin le plus long appartient à une compagnie très riche, dont Milord Bute, ancien ministre, est un des principaux intéressés. Cette compagnie est non-seulement propriétaire du Royalty de plusieurs mines, mais encore elle en afferme une très grande quantité sur toute la route. Elle doit extraire immensément de charbon, car le chemin est presque toujours couvert de chariots. Cette compagnie n’est pas dans le cas d’épargner la dépense pour faciliter son exploitation & le débouche des matières qu’elle en tire." Gabriel Jars, ''Voyages Metalurgiques'', self-published, Paris, 1774, page 205.Practically the whole of the coals from the Tanfield and South Moor districts came down to the
Newcastle and Carlisle Railway
The Newcastle and Carlisle Railway was formed in 1829 to build a line linking the two towns. The company was slow to finalise its route and slow to complete construction, but in September 1836 the N&CR decided to make its eastern terminus at Redheugh, on the south bank of the River Tyne, a little short of Gateshead. The route was to intersect the Tanfield waggonway near Dunston without making a junction. An independent company, the Blaydon, Gateshead and Hebburn Railway (BG&HR) was formed in May 1834 to build a line fromStanhope and Tyne Railway
Promoters had brought forward theBrandling's private railway
In 1834 and 1835 R W Brandling and John Brandling secured leases of the coal in a large area about four miles southward from South Shields and seven miles inland from the coast, and in May 1835 they proposed a railway serving this area, and connecting Gateshead withThe Brandling Junction Railway
The Brandling Junction Railway Company now made an agreement with the Newcastle and Carlisle Railway Company (on 19 February 1836), whereby it paid £9,000 to the Newcastle and Carlisle Company for certain powers, and the N&CR agreed to the abandonment of the proposed Gateshead, South Shields and Monkwearmouth Railway. The Brandling Junction would form a junction with the Newcastle and Carlisle Railway at the point where it intended crossing the Tyne (presumed at this stage to be close to Gateshead) and to re-lay the old Tanfield Waggonway to Tanfield Lea Colliery, and to build the line planned by the Blaydon Gateshead and Hebburn company to Jarrow and to form shipping places there. The wayleave system was firmly entrenched in the area at the time, and the brothers did not apply to purchase land, but to use wayleaves, for which they had arranged contracts, paying £2,069 annually. In the following year the brothers obtained the incorporation of a company (as opposed to their personal rights) to undertake the work; on 7 June 1836 the Brandling Junction Railway was incorporated. The wayleaves were now valued at £3,434 which the company paid the brothers, so that they acquired a 70% mark-up. TheOpening of the line
The Brandling Junction Railway opened its first section from the junction with the N&CR near Redheugh to Oakwellgate (immediately east of Gateshead High Street) and down to the quay on 15 January 1839. From Redheugh there was a half-mile inclined plane at a gradient of 1 in 23, the line continuing through a deep cutting to Greenesfield, where there was a 60 hpPassenger business
The original opening attracted a great deal of passenger traffic:We are glad to announce that the Brandling Junction Railway from South Shields to Monkwearmouth, has, since its opening on Tuesday week, received more support than its most sanguine friends ever expected. Between three and four thousand passengers have already been conveyed along its line, and the numbers are daily on the increase. This railway is a great accommodation to the people both of South Shields and Sunderland, as also to those of Newcastle, North Shields, and their respective neighbourhoods; and there is little doubt that the spirited Proprietors will be well rewarded for the capital they have expended. We are glad to find that the Directors are about to show their sense of the public patronage, by having an omnibus to run between the depot, at the high part of South Shields, and the Market-place and the Steam Ferry Landing. This will be a great acquisition, and will remove much of the complaint that the depot was so far from the centre of the town. We may observe that the steam-boats, on their passage from Newcastle, always stop opposite the railway station, in order to allow passengers to disembark, who may be going to Sunderland. All has gone on well since the day of opening, not the least accident having occurred to mar the pleasures of travelling on this important line of railway.Port-of-Tyne Pilot, reprinted in the Railway Times, 1 July 1839An omnibus connection was also to be laid on at Sunderland:
Arrangements are now in progress for running Omnibuses from Sunderland to the station of the Brandling Junction Railway, at Monk-Wearmouth, which will be a very great accommodation to parties travelling by this line. We understand Mr. Henderson, the spirited proprietor of the Golden Lion Hotel, has contracted with the Railway Company for running the Omnibuses, and that for better public accommodation it is Mr. Henderson’s intention to have an office at the Golden Lion, for the receiving of parcels intended to be forwarded by this railway These arrangements will very shortly come into operation.Newcastle Journal, 21 September 1839, accessed at The British Newspaper Archive, subscription required
Contemporary description of the line
The Railway Times described the route:The Junction of the Brandling with the Carlisle line is formed on the Quay, at the south side of the river Tyne, about a mile west of Gateshead; and from thence it proceeds by an incline, rising one foot in twenty-three, first along a heavy embankment, and then through a deep cutting, in some parts forty-five feet in depth, to the top of the hill in Green’s Field, where a standing engine, of sixty horse power, built by Messrs. Hawthorn, of Newcastle, has been erected for the purpose of working the incline.
Leaving Redheugh stationn fact passing above it at high level N, or n, is the fourteenth letter in the Latin alphabet, used in the modern English alphabet, the alphabets of other western European languages and others worldwide. Its name in English is ''en'' (pronounced ), plural ''ens''. History ...the line passes through the town of Gateshead, along a magnificent viaduct, built of stone, which is upwards of half a mile in length, and crosses the principal street by a beautiful span, with two smaller arches enclosing the footpath... The line after crossing Oakwell Gate enters the principal station he Gateshead station of the BJR on an extensive mound with precipitous banks extending down to the river. A self-acting incline is at present in operation own to the Tynehere, and coals, which are brought along the Newcastle and Carlisle line, are regularly shipped at staiths erected for the purpose by the Brandling Company... It was resolved to build the atesheadstation level, on the same principle as the viaduct, with a succession of arches. There are twelve of these arches at present in course of formation... hey forma series of tunnels running parallel to each other, and perpendicular to, or at right angles with, the main line, from which a branch line passes along the top of each tunnel to platforms which are made to descend, and thus form a communication with the area below.
Emerging from the principal station, the line makes a considerable curve, and then proceeds in a south-eastern direction, with an inclination of about fourteen feet in a mile, until it reaches the summit level within a short distance of Pelaw Main, where the line is about one hundred feet above the level of the sea. The railway passes under a neat stone bridge at Felling Hall gate, and soon after enters a cutting, from which it emerges at Hedworth Dean, which it crosses by an embankment thirty feet high. Proceeding onward, it enters a tunnel one hundred feet in length; after emerging from which the line continues through a deep cutting with side walls for about thirty yards, when it enters another tunnel four hundred and seventy feet in length. The line continues with a gentle inclination to Moncton-lane, where it passes under an oblique arch, and then proceeds by heavy embankments over Hedworth Dean... From Hedworth the line proceeds to Brockley Whins, soon after passing which a branch leads away to South Shields, whilst the main line makes a gentle curve to the south, crosses the Stanhope and Tyne Railway on the same level, and runs along a low embankment... The line enters a deep cut through limestone rock a little before it reaches Fulwell toll-bar, and just afterwards passes under a neat oblique stone arch, over which the Sunderland and Shields turnpike is carried; it then curves gently towards the south, and passes the village of Fulwell to the left, soon after which a branch railway goes down to Wearmouth Docks, whilst another branch n fact the main lineproceeds to near the Wheat Sheaf Inn, where the line at present terminates. There is a depot for passengers and goods behind the Wheat Sheaf Inn, and it is intended to continue this line down to the river, a little above Sunderland Bridge. The Docks are approached by a self-acting incline, with an inclination of one foot in eighteen; and staiths and other conveniences are in course of erection for the shipment of coals, as well as general merchandize.
We shall now follow the course of the line from the junction at Brockley Whins to South Shields, premising that passengers direct from Shields to Sunderland, and vice versa, are not conveyed along this portion of the line, but proceed along a junction branch which runs from the main line from Sunderland to Gateshead, at a place called the Tile Sheds, and joins the line from Gateshead to Shields at West Dean Lodge. A spherical triangle is thus formed by the junction lines, the curves upon which average somewhere about sixty chains radius. The branch to Shields, after leaving the main line at Brockley Whins, proceeds on the west side of, and parallel to, the Stanhope and Tyne Railway, till it joins the branch from Sunderland at a well-known place on the Boldon-lane, called "Old Jonathans". It then crosses the Dean by an embankment, which is in some parts forty-five feet in depth, and continues past Temple town to the Railway leading from the St. Hilda Pit to the river. The line passes under Commercial-road by a short tunnel, and then enters the station yard at South Shields. This station is formed on the site of a large ballast hill, which has been partially removed for the purpose. It is situated but a short distance from Holborn, which is approached through another tunnel, about 100 feet in length, with stone abutments and a brick arch; and the line after crossing Holborn proceeds down to the St. Hilda Staiths, and terminates at Archer’s Quay, where it is proposed to erect staiths.
The rails, which are of a similar section to those of the Newcastle and Carlisle Railway, are laid on stone blocks, where the foundation is sufficiently good, but along the embankments they are laid on larch sleepers, until such time as the earth becomes consolidated, when they will be replaced as in the permanent way with stone blocks. There will be a double line of railway throughout when completed, but at present the double way is formed in some parts only.
Brockley Whins junctions
References to Brockley Whins are capable of misunderstanding; at first the name simply referred to the general area. As far as the Stanhope and Tyne Railway was concerned, "Brockley Whins" as a railway location was north of the Pontop Crossing complex. The Brandling Junction Railway later (on 9 March 1840) opened a station of that name west of the Pontop Crossing; at first it was only an exchange platform for connectional purposes.M E Quick, Railway Passenger Stations in England Scotland and Wales—A Chronology, The Railway and Canal Historical Society, 2002 The Brandling Junction Railway (broadly west to east) and the Stanhope and Tyne Railway (broadly south to north) crossed by a flat crossing, and spurs were later laid connecting the two railways. Tomlinson and other early writers refer indiscriminately to Brockley Whins as a location on both railways independently of the station. Junction names change over time with the development of signalling areas of control, but Cook and Hoole give: South Shields to Monkwearmouth: * Harton Junction; northern apex, south-westward divergence of Gateshead line; * Tile Shed Junction; eastern apex, convergence of line from Gateshead. Harton Junction to Gateshead: * Green Lane Junction; intermediate northern apex; connections with Pontop and South Shields Railway; * Brockley Whins; convergence of line from Tile Shed Junction. 1844 south to west curve: * Hedworth Lane Junction; southern apex; divergence north-east of line to Tile Shed Junction, and divergence north of Pontop and South Shields line; * Brockley Whins.Early years
An arrangement was made between the Brandling Junction, Stanhope and Tyne and Durham Junction Railway Companies, with the object of establishing passenger communication, partly by railway and partly by omnibus, between Newcastle, South Shields and Sunderland on the one hand, and Hetton, Houghton-le-Spring, Durham, Stockton and Darlington on the other. To enable this it was necessary to make a spur connection from the Brandling Junction line to the Stanhope and Tyne line at Brockley Whins by a short west-to-north loop line about 8 chains long. The cost was borne by the three Companies in equal proportions. The loop was opened on 9 March 1840, when the new passenger service started.Tomlinson, page 333 Tomlinson says "Having closed the Biddick or Harton Branch soon after it had been opened, the Brandling Company brought their traffic between South Shields and Sunderland round by Brockley Whins."Tomlinson, pages 415 and 416 The "Biddick or Harton Branch" is the original direct line from South Shields as far as the convergence at Cleadon Lane (or Tile Shed Junction). It closed on 9 March 1840.Hoole, says "probably" on that date Passenger traffic was diverted, for connectional purposes at Brockley Whins station; evidently there was little demand for non-passenger traffic between South Shields and Monkwearmouth. Until 1844 there was a complex procedure for the joining and dividing of passenger trains at Brockley Whins station; the trains from and to Monkwearmouth, South Shields and Gateshead converged more or less simultaneously at Brockley Whins and a convoluted shunting procedure resulted in through carriages being exchanged between the trains. Tomlinson adds:Between 1840 and 1844... another skilful manoeuvre, not unattended with danger, was performed at Brockley Whins when the train from Rainton Meadows n the Durham Junction Railwayhappened to arrive too late to catch the Brandling Junction train, and had to proceed to Gateshead with the passengers. It was necessary for the engine to be changed from one end of the train to the other. Detached from the moving train about half-a-mile from Brockley Whins ctually from the north junction of the complex, at Green Lane Junction when it steamed ahead past the junction, then ran back to the junction and entered the loop line owards Brockley Whins station the carriages following at a slower rate of speed had also passed the junction, the engine slipped out through the points and regained possession of its train which it then took, tender first, through the loop line to Brockley Whins and thence to Gateshead.An inner, small radius connection from west to north at the Pontop Crossing, duplicating the 1839 connection, was opened on 9 March 1840.R A Cook and K Hoole, ''North , Eastern Railway Historical Maps'', Railway and Canal Historical Society, 1975 revised 1991, Col M H Cobb, ''The Railways of Great Britain—A Historical Atlas'', Ian Allan Publishing Limited, Shepperton, 2003,
Passengers on the Tanfield branch
The Brandling Junction Railway started carrying passengers on the Tanfield Branch on 16 June 1842, between Tanfield Lea and Gateshead. There were four recognised stations at Tanfield Lea, Bowes Bridge, Fugar Bar and Redheugh (N&CR), and "an unofficial stopping place by the Whickham Turnpike at Lobley Hill". The passenger service operated only on Saturdays and the journey time was an hour. At first a passenger coach was provided but soon coal wagons were the means of conveyance. The passenger service was discontinued about 1844.Quick (page 279) gives more detail, amplifying that in Whittle, page 46: Opened 18 June 1842; trains ran on Tuesdays, Thursdays and saturdays; there was one train each way except on pay Saturdays when there were two trains back from Gateshead, at and . The trains ran to and from Oakwellgate (Gateshead) and probably ceased on 2 September 1844.Signalling
Flag signals were used to give instructions to enginemen approaching the flat crossings at Brockley Whins and Boldon Lane (the site of the later Tyne Dock station); instructions from November 1839 indicate the procedure. Near the crossing, on each line, stood three posts, a short distance apart, the first post on the Brandling Junction line having a white flag upon it and the first post on the Stanhope and Tyne line a red flag. When a train reached the first post the engineman blew his whistle; at the second post he slackened speed; if there was a flag hoisted at the crossing—white for the Brandling Junction and red for the Stanhope and Tyne trains he proceeded through the crossing at half speed, but if no flag was exhibited, or if both flags were hoisted and waved backwards and forwards he stopped at the third post. The same rules were observed at night time, when lamps were hoisted instead of flags. During fogs he blew his whistle at intervals all the way from the first to the third post, where he was obliged to stop and send his fireman to the signalman for orders.Regulations for the enginemen of the Brandling Junction and Stanhope and Tyne Railways, 30 October 1839, quoted in Tomlinson, page 411. "Collision at Boldon Lane", article by Rob Langham in North Eastern Express, August 2020, pp 71-73Rolling stock and fares
The company used six-wheeled steam locomotives with four-wheeled tenders; they burnt coke. Passenger carriages had three compartments; those for first class carried 24, and the second class carriages seated 30 passengers; the coaches were painted bright yellow picked out with black. Seven services ran each weekday at an average speed of ; the fare from Gateshead to Monkwearmouth was 1s 6d for first class and 1s. Over 186,000 passengers were carried in the four months to the end of January 1840.Francis Whishaw, ''The Railways of Great Britain and Ireland Practically Described and Illustrated'', J. Weale, 1842, page 50Great North of England Railway
In October 1835 plans had been put forward for a Great North of England Railway, "for the purpose of connecting Leeds and York with Newcastle-upon-Tyne and forming a continuation of all the proposed lines from the metropolis towards Scotland"—a significant step in creating the presentModernising the Tanfield line
Since 6 February 1839, the Brandling Company had been engaged in re-laying the old Tanfield Lea waggonway between the Colliery and Lobley Hill ( miles) and in making a short connecting line ( mile) between it and the Team branch. Leaving some of the heavier works to be finished afterwards, they began the leading of coals on 26 November 1839, employing horses on those parts of the line which were intended to be worked by stationary engines. Rising 536 feet in miles and falling 90 feet in miles, the line presented a series of gradients varying from 1 in 12 to 1 in 454, which involved several changes of motive power. Between Redheugh and Tanfield Lea there were three horse planes t Tanfield Lea ( mile), Lobley Hill ( mile) and the Teams ( mile) three engine planes he Causey Wood west incline ( mile), the Causey Wood east incline ( miles) and the Sunniside incline (1 mile) and two self-acting inclines, (the Lobley Hill incline ( mile) with a gradient of 1 in 18 and the Fugar Bar incline or Baker's Bank (1 mile) with gradients of 1 in 12 and 1 in 21). Traffic from the Tanfield line had to pass over about 250 yards of the Newcastle and Carlisle Railway at Redheugh to reach the incline of the Brandling Junction. The Tanfield Moor branch was an extension of the Tanfield branch. It rose from Tanfield Lea to Whitelee Head on gradients of 1 in 22 and 1 in 15, which allowed it to be worked by gravity. It formed the last of the series of inclines, which, representing a difference of level of 800 feet in miles, "made the Tanfield branch one of the most interesting lines of the North Eastern Railway system". By means of this short branch, the Brandling Junction Railway Company were enabled to divert to their own line and shipping places the Tanfield Moor coals which for six years had been conveyed along the Stanhope and Tyne Railway to South Shields. In consequence of this diversion of traffic, a mile and a quarter of the latter railway—between Tanfield Moor and Harelaw—fell into disuse. Though the Tanfield line was opened throughout, it was not until 1 March 1841, that the company were able to make use of the stationary engines in the conveyance of their coals. Wire ropes were just coming into use at the close of this period; they appeared on the Brandling Junction Railway in June 1841.Financial impropriety
The Stanhope and Tyne Stanhope and Tyne Railway Company found itself in serious financial difficulty in a scandal in which the directors had been misrepresenting the profits of the company. This prompted shareholders in the Brandling Junction Railway to inquire into their own company's state of finances, and a Committee of Investigation was appointed on 6 May 1842. After a lengthy and exhaustive inquiry they found that the Brandling Junction Railway too was not paying its way, although annual accounts had been published stating the contrary. Dividends at 6% had been paid out of capital and it was found that the directors had been in the habit of misrepresenting the accounts at the end of the half-year, to give the appearance of a profit. As well as improper accounting, the directors had raised money for capital works on their personal bonds, subsequently vesting these in themselves and mortgaging to themselves the remainder of the shares unissued. Apart from the improper acquisition of shares, this resulted in an annual interest charge amounting to £16,460 in 1842. In consequence of these revelations the company's shares fell in the market upwards of 50 per cent. Meanwhile, the Stanhope and Tyne Railway, in a much worse trading condition, went into liquidation. Its railway assets and the operation were transferred to a new company, the ''Pontop and South Shields Railway'', in 1842.Traffic development
For some time after the opening of the Brandling Junction railway, the shipment of coal was confined to Gateshead and Monkwearmouth. Shipping berths had been secured at South Shields, but the Brandling company could not get rail access to them until they upgraded and converted the gauge of the old Manor Wallsend waggonway of 1810, which was their only means of access. They were obliged to alter the whole waggonway, and to alter the wheels of the colliery waggons to suit the widened gauge. Some delay took place in the construction of the coal drops due to the exceptionally wet autumn of 1839. The company finally started shipping coal from South Shields on 5 February 1840. They had two drops (one used jointly with Messrs Brandling in their own right) and a spout; the Stanhope and Tyne Railway Company had eight drops, making altogether ten drops and a spout: an inadequate capacity for the quantity of coal which needed to be shipped from South Shields. A proposed dock of 20 acres was supposed to be constructed at Jarrow Slake, and the Tyne Dock Company obtained an Act of Parliament for the purpose on 1 July 1839, with capital of £150,000. Tenders had been invited for the construction, but the Tyne Dock Company proprietors were mainly shareholders of the Stanhope and Tyne Railway, which at this time was discovering the extent of its financial difficulties, and the dock construction was never started. On 18 June 1842 the Company started to carry passengers between Tanfield Lea and Gateshead. They also completed the extension of their line from the west end of South Shields to the centre of the town, a distance of mile, opening a new passenger and goods station at Heron's Hill on 17 December 1842. The new station was close to the steam ferry terminal and the market place, and opening notices referred to it as Market Place station. The old station at West Holborn was replaced by a small station called High Shields in Wreken Dyke Lane at Grewcocks. The Brandling Junction Company was busy enlarging the scope of their business by means of private railways. Using the Pelaw Main Waggonway they drew traffic from Birtley and Urpeth, and by means of the Springwell waggonway they conveyed passengers to and from Jarrow by horse power. Their ownership of the modernised Tanfield Waggonway route already gave them access to Tanfield Moor; when the Derwent Iron Company opened a mile line from Tanfield Moor to Harelaw (near Annfield Plain) on 26 December 1843, the Derwent Company chose to send lead and lime from the western end of the old Stanhope and Tyne Railway (now Pontop and South Shields Railway) down the Tanfield line. Consett Ironworks was newly founded with enormous potential for growth, and more efficient rail transport of the ironworks output was the motivation for the Derwent Company; securing the bulk of this traffic was a huge advantage for the Brandling Junction Railway. They made a short ( mile) branch at South Shields to Metcalf's Dock from which they began shipping coals in the spring of 1844 relinquishing the original Archer's Quay, and by arrangement with the Pontop and South Shields Company, they secured the whole of the south traffic in passengers and goods between Brockley Whins and South Shields. While this was going on, George Hudson's group of main line railways were improving the north–south trunk route that became the East Coast Main Line. On 15 April 1844, a portion of his Newcastle and Darlington Junction Railway (successor to the Great North of England Railway) opened connecting lines near Durham on 15 April 1844. The Pontop and South Shields Company had laid down a third line of rails between Washington and Boldon for the exclusive accommodation of the Newcastle and Darlington traffic; jointly with the Brandling Junction Company they built a branch line from Boldon to Brockley Whins: a south to west curve, which opened on 19 August 1844. From 24 May 1844 trains could run from London and York to Gateshead via Washington and Brockley Whins, from 24 May until 19 August 1844 reversing at the north apex of the junctions.Demolition of Brockley Whins Viaduct, in Railway Magazine, February 1941Acquisition by George Hudson
After 1844
From 1 September 1844 the Brandling Junction Railway ceased to have an independent existence, and was part of the Newcastle and Darlington Junction Railway, which was itself part of George Hudson's group of companies. The domestic traffic continued largely unchanged, but the new owner's emphasis was on the development of the north–south trunk route. This included crossing theTanfield branch improvements
The Tanfield branch had several engine-worked inclined planes, with the intermediate sections worked by horses. In July 1881 locomotive operation was started, with closure of the inclines.The twentieth century
In 1923 the main line railways of Great Britain were "grouped" under theNotes
References
Further reading
* *{{cite book, url=https://archive.org/stream/railwaysgreatbr00whisgoog, title=The Railways of Great Britain and Ireland Practically Described and Illustrated, first=Francis, last=Whishaw, edition=2nd, location=London, publisher=John Weale, year=1842, pages=44–50, oclc=833076248External links
Durham Waggonways at https://sites.google.com/site/waggonways/railways-durham Rail transport in the United Kingdom Horse-drawn railways Transport in South Shields