Boston University Central station is a surface-level light rail station on the
MBTA The Massachusetts Bay Transportation Authority (abbreviated MBTA and known colloquially as "the T") is the public agency responsible for operating most public transportation services in Greater Boston, Massachusetts. The MBTA transit network in ...
Green Line Green Line may refer to: Places Military and political * Green Line (France), the German occupation line in France during World War II * Green Line (Israel), the 1949 armistice line established between Israel and its neighbours ** City Line ( ...
B branch, located the center median of Commonwealth Avenue west of St. Marys Street in Boston, Massachusetts, surrounded by the Boston University campus. It consists of two side platforms, which serve the B branch's two tracks. The station is accessible, with raised platforms to allow level boarding onto low-floor trams and a high platform on the inbound side to serve high-floor trams. Boston University Central is one of seven surface stations on the branch that are accessible (the others being , , , , and the B branch's terminus at ).


History

The station has the third-highest ridership on the B branch (after only Harvard Avenue and ). In the early 2000s, the MBTA modified key surface stops with raised platforms for
accessibility Accessibility is the design of products, devices, services, vehicles, or environments so as to be usable by people with disabilities. The concept of accessible design and practice of accessible development ensures both "direct access" (i. ...
. Portable lifts were installed at Boston University Central around 2000 as a temporary measure. Construction at Boston University Central and Boston University East was part of a $32 million modification of thirteen B, C, and E branch stations. During construction, an interim station with temporary platforms between the two stops was used. Construction began on March 18, 2002, a week behind schedule due to delays in finishing up similar work at Harvard Avenue and Washington Street. The project was then expected to be completed within six months. However, poor weather and limited work periods (as most work could only be done during the four hours at night that no trains used the line) delayed the completion date first to December 2002, then March 2003. The contractor informed the MBTA in early 2003 that they would be unable to complete the work; a new contractor was chosen in mid-2003, but work did not resume until September. The stations were completed and reopened on November 18, 2003. Around 2006, the MBTA added a wooden
mini-high platform Railway platform height is the built height – ''above top of rail (ATR)'' – of passenger platforms at stations. A connected term is ''train floor height'', which refers to the ATR height of the floor of rail vehicles. Worldwide, there are m ...
on the inbound side, allowing level boarding on older Type 7 LRVs. These platforms were installed at eight Green Line stations in 2006–07 as part of the settlement of '' Joanne Daniels-Finegold, et al. v. MBTA''. Nearby stops were proposed on the Urban Ring – a circumferential
bus rapid transit Bus rapid transit (BRT), also called a busway or transitway, is a bus-based public transport system designed to have much more capacity, reliability and other quality features than a conventional bus system. Typically, a BRT system includes ...
(BRT) line designed to connect the existing radial MBTA rail lines to reduce overcrowding in the downtown stations. Under draft plans released in 2008, the Urban Ring would have run over the
Grand Junction Railroad Bridge The Grand Junction Railroad Bridge is a steel plate girder bridge carrying the Grand Junction Railroad over the Charles River in Boston, connecting the Boston University campus to Cambridgeport. In September 2009, the Commonwealth of Massachuset ...
, on a dedicated busway under the
Boston University Bridge The Boston University Bridge, originally the Cottage Farm Bridge and commonly referred to as the BU Bridge, is a steel truss through arch bridge with a suspended deck carrying Route 2 over the Charles River, connecting the Boston University cam ...
, and along University Road and Mountfort Street. A southbound BRT stop would have been located on University Road, with the northbound stop on Mountfort Street near Carlton Street. The project was cancelled in 2010.


Bus connections

Four
MBTA bus The Massachusetts Bay Transportation Authority (MBTA) operates List of MBTA bus routes, 170 bus routes in the Greater Boston area. The MBTA has a policy objective to provide transit service within walking distance (defined as ) for all residents ...
routes have connections near the station: *: Sullivan Square stationRuggles station *:
Central Square, Cambridge Central Square is an area in Cambridge, Massachusetts centered on the junction of Massachusetts Avenue (Cambridge), Massachusetts Avenue, Prospect Street and Western Avenue. , formed by the junction of Massachusetts Avenue, Columbia Street, Sidne ...
Broadway station *: – Kenmore station *: –Kenmore station *: Watertown Yard– Haymarket station Routes CT2 and 47 stop at Commonwealth Avenue at University Road (northbound) and Mountfort Street at Lenox Street (southbound) to the west of the station, and Park Drive at Beacon Street to the south. Routes 57 and 57A (plus the limited-service 193) stop on Commonwealth Avenue at Saint Mary's Street directly across from the station.


References


External links


MBTA – Boston University CentralSaint Mary's Street entrance from Google Maps Street View
{{MBTA Subway Stations Green Line (MBTA) stations Railway stations in Boston Railway stations in Massachusetts at university and college campuses Railway stations in the United States opened in 1894