Beaver Brook Station
   HOME

TheInfoList



OR:

Beaver Brook is a former
MBTA Commuter Rail The MBTA Commuter Rail system serves as the commuter rail arm of the Massachusetts Bay Transportation Authority's transportation coverage of Greater Boston in the United States. Trains run over of track to 141 different stations, with 58 statio ...
station in
Waltham, Massachusetts Waltham ( ) is a city in Middlesex County, Massachusetts, United States, and was an early center for the labor movement as well as a major contributor to the American Industrial Revolution. The original home of the Boston Manufacturing Company, th ...
. It served the
Fitchburg Line The Fitchburg Line is a branch of the MBTA Commuter Rail system which runs from Boston's North Station to Wachusett station in Fitchburg, Massachusetts. The line is along the tracks of the former Fitchburg Railroad, which was built across norther ...
. It was located near Main Street east of the center of town, and was named after a nearby
brook A brook is a small river or natural stream of fresh water. It may also refer to: Computing *Brook, a programming language for GPU programming based on C *Brook+, an explicit data-parallel C compiler *BrookGPU, a framework for GPGPU programming ...
of the same name.


History

The grade crossing of Main Street ( Route 20) at the station was proposed for elimination in 1913 and 1923; it was finally replaced by a bridge slightly to the east in 1935–36 – the first grade crossing elimination conducted as a
Works Progress Administration The Works Progress Administration (WPA; renamed in 1939 as the Work Projects Administration) was an American New Deal agency that employed millions of jobseekers (mostly men who were not formally educated) to carry out public works projects, i ...
project. In December 1958, Beaver Brook was one of eleven stations – four commuter rail stations in Waltham and Weston, and seven stops west of Fitchburg – on the Fitchburg Route proposed for closure. Stony Brook in Weston and the seven western stations were closed on June 14, 1959; limited service continued to , , and Beaver Brook. The station was closed in June 1978 along with Clematis Brook station on the Fitchburg Line and Winchester Highlands station on the
Lowell Line The Lowell Line is a railroad line of the MBTA Commuter Rail system, running north from Boston to Lowell, Massachusetts. Originally built as the New Hampshire Main Line of the Boston & Lowell Railroad and later operated as part of the Boston & M ...
. All three stops served only rush hour trains at the time of their closing. The station building is no longer extant, but a short section of platform remains.


References


External links


Station location on Google Maps Street View
MBTA Commuter Rail stations in Middlesex County, Massachusetts Former MBTA stations in Massachusetts Waltham, Massachusetts Railway stations closed in 1978 1978 disestablishments in Massachusetts {{Massachusetts-railstation-stub