HOME

TheInfoList



OR:

Barh Super Thermal Power Station or NTPC Barh is located in
Barh Barh is a town and one of the 6 sub-division of Patna District, Bihar in India. It is located on the southern bank of the Ganges. Population , Barh had a total population of 316,348 residents, with 162,354 males and 153,994 females. Barh h ...
in the Indian state of
Bihar Bihar (; ) is a state in eastern India. It is the 2nd largest state by population in 2019, 12th largest by area of , and 14th largest by GDP in 2021. Bihar borders Uttar Pradesh to its west, Nepal to the north, the northern part of West Be ...
. NTPC Barh is located barely east of the
Barh Barh is a town and one of the 6 sub-division of Patna District, Bihar in India. It is located on the southern bank of the Ganges. Population , Barh had a total population of 316,348 residents, with 162,354 males and 153,994 females. Barh h ...
sub-division on National Highway-31 in
Patna district Patna district is one of the thirty-eight districts of Bihar state in eastern India. Patna, the capital of Bihar, is the district headquarters. The Patna district is a part of Patna division. The Patna district is divided into 6 Sub-divisions ( ...
. The project has been named a mega power project, and is owned by Indian energy company
National Thermal Power Corporation NTPC Limited, formerly known as National Thermal Power Corporation Limited, is an Indian central public sector undertaking under the ownership of the Ministry of Power, Government of India which is engaged in generation of electricity and ...
. The project has been contested as it is nearby Himalayan Range and needs stricter anti-pollution controls. The 1,320 MW (2 x 660 MW) Barh Stage-2 built by
BHEL Bharat Heavy Electricals Limited (BHEL) is an Indian central public sector undertaking. It is under the ownership of Ministry of Heavy Industries, Government of India. It is based in New Delhi, India. Established in 1956, BHEL is India ...
is operational while 1,980 MW (3 x 660 MW) Barh Stage-1 is being built by Russian firm
Technopromexport Technopromexport (russian: Технопромэкспорт) is a Russian engineering company that builds energy facilities in Russia and abroad, including hydropower, thermal, geo-thermal and diesel power plants, power lines and electricity sub ...
(TPE). Bihar's share is 1183 MW from NTPC Barh (26% from stage 1 and 50% from stage 2). The main power plant and the township is spread over an area of of land, which includes 12 villages. The then PM,
Atal Bihari Vajpayee Atal Bihari Vajpayee (; 25 December 1924 – 16 August 2018) was an Indian politician who served three terms as the 10th prime minister of India, first for a term of 13 days in 1996, then for a period of 13 months fr ...
, had laid the foundation stone of the main plant of stage-1 of NTPC Barh on March 6, 1999. The formal inauguration of its site office and laying of the foundation stone of the training centre at the plant site was done in September 2003.


Project cost

The plant is to produce 3,300 MW of power at a cost of over Rs 26,000
crore A crore (; abbreviated cr) denotes ten million (10,000,000 or 107 in scientific notation) and is equal to 100 lakh in the Indian numbering system. It is written as 1,00,00,000 with the local 2,2,3 style of digit group separators (one lakh is e ...
. The total approved cost of stage-1 (660 MW x 3) has Rs 8,692.97 crore. The total approved cost of stage-2 (unit 1) plant is Rs 7,688.12 crore.


Capacity

Unit-1 of stage-2 commissioned in November 2013. Unit-2 of stage-2 commissioned in March 2015. The first unit (of stage-I) of NTPC Barh is expected to start generation from December 2019 instead of the scheduled August 2020, while the second and third units of stage-I will be made operational in December 2020 and August 2021, respectively.
Inland Waterways Authority of India Inland Waterways Authority of India (IWAI) is the statutory authority in charge of the waterways in India. It was constituted under IWAI Act-1985 by the Parliament of India.http://iwai.nic.in/showfile.php?lid=882 See section 3 of the act Its hea ...
received bids in 2013 September for coal movement on 1620 km
National Waterway 1 (India) The National Waterway 1 (NW-1) or Ganga-Bhagirathi-Hooghly river system is located in India and runs from Prayagraj in Uttar Pradesh to Haldia in West Bengal via Patna and Bhagalpur in Bihar across the Ganges river. It is long, making it t ...
from
Haldia Haldia is an industrial port city in Purba Medinipur in the Indian state of West Bengal. It is a major river port and industrial belt located approximately southwest of Kolkata near the mouth of the Hooghly River, one of the distributaries of ...
to NTPC's Barh which is about away.


Boiler balance work of Stage-I

The boiler balance work of Stage-I (3 x 660 MW)(BSTPP) was allotted to Doosan Power Systems India Ltd, (Korea) Company in January 2016. The work is under contract with Power Mech Projects Ltd.


Flue gas desulphurization addition

As per MOEF guidelines of Dec-2015 NTPC decided to add FGD units to all units to limit SOX emissions. BHEL was awarded the contract to supply FGD units.


References


External links


NTPC Barh website

BSTPP Video
{{Power stations of Bihar Coal-fired power stations in Bihar Patna district 2013 establishments in Bihar Energy infrastructure completed in 2013