The Bala and Festiniog Railway was a , standard gauge, railway backed by the Great Western Railway (GWR) in north-west Wales. It connected Bala with Blaenau Ffestiniog.


History

The railway originally connected Bala with
Llan Ffestiniog Llan Ffestiniog, also known as Ffestiniog or simply Llan, is a village in Gwynedd (formerly in the county of Merionethshire), Wales, lying south of Blaenau Ffestiniog. Llan Ffestiniog is the older of the two communities, with its church and othe ...
. It was incorporated on 28 July 1873 and opened on 1 November 1882. In 1883 the line was extended by
converting Converting companies are companies that specialize in modifying or combining raw materials such as polyesters, adhesives, silicone, adhesive tapes, foams, plastics, felts, rubbers, liners and metals, as well as other materials, to create new pro ...
the existing
Festiniog and Blaenau Railway The Festiniog & Blaenau Railway (F&BR) was a narrow gauge railway built in 1868 to connect the town of Blaenau Ffestiniog in Wales with the slate quarries around Tanymanod and the village of Llan Ffestiniog, to the south. At Blaenau Ffes ...
between Llan Ffestiniog and Blaenau Ffestiniog from gauge to standard gauge. The line terminated at Blaenau Ffestiniog (GWR) where until 1939 it connected with the Ffestiniog Railway to
Porthmadog Porthmadog (; ), originally Portmadoc until 1974 and locally as "Port", is a Welsh coastal town and community in the Eifionydd area of Gwynedd and the historic county of Caernarfonshire. It lies east of Criccieth, south-west of Blaenau Ff ...
. At , the line connected with the Ruabon to Barmouth GWR line. The Bala and Festiniog was vested in the Great Western Railway on 1 July 1910. On nationalisation in 1948 management of the line passed to the
Western Region of British Railways The Western Region was a region of British Railways from 1948. The region ceased to be an operating unit in its own right on completion of the "Organising for Quality" initiative on 6 April 1992. The Region consisted principally of ex-Great We ...
. The line closed to passengers in 1960 and to freight in 1961. An unusual feature of freight operation on the line was the carriage of gauge slate wagons (provided by the GWR) on standard gauge
transporter wagon A transporter wagon, in railway terminology, is a wagon ( UIC) or railroad car (US) designed to carry other railway equipment. Normally, it is used to transport equipment of a different rail gauge. In most cases, a transporter wagon is a n ...
s between and Blaenau Ffestiniog where the wagons were off-loaded in the large station yard and their loads of dressed slate transferred to standard gauge GWR wagons for carriage back the way they had come then on via Manod and Bala. The building of the
Llyn Celyn Llyn Celyn () is a reservoir constructed between 1960 and 1965 in the valley of the River Tryweryn in Gwynedd, Wales. It measures roughly long by wide, and has a maximum depth of . It has the capacity to hold of water. It was originally ...
reservoir necessitated the flooding of the line. A diversion was considered but never built. A short section from to remained open but was eventually closed in 1965. The summit of the line was at which lay at above sea level. The line served an extremely remote area of North Wales, most of which was not served by a main road until the
A4212 road A4 most often refers to: *A4 paper, a paper size defined by the ISO 216 standard, measuring 210 × 297 mm A4 and variants may also refer to: Science and mathematics * British NVC community A4 (''Hydrocharis morsus-ranae - Stratiotes aloide ...
opened in the early 1960s. In 1964, a connection was made through Blaenau to the Conwy Valley Line at allowing access as far as
Trawsfynydd nuclear power station Trawsfynydd nuclear power station ( cy, Atomfa Trawsfynydd) is a decommissioned Magnox nuclear power station situated in Snowdonia National Park in Gwynedd, Wales. The plant, which became operational in 1965, was the only nuclear power station i ...
; a loading facility for nuclear flasks was constructed on a siding a hundred yards north of the closed . In 1982, the Ffestiniog Railway was reopened to a wholly new Blaenau Ffestiniog on the site of the former GWR station. Conwy Valley line services were extended along the 1964 connection to the new interchange station and Blaenau Ffestiniog North (LNWR) was closed. On 17 July 1989, the first passenger train beyond Blaenau Ffestiniog ran to a temporary platform at Trawsfynydd (Maentwrog Road). Organised by Provincial, regular Sunday services ran from Sunday 23 July to Sunday 10 September in the form of an extension of the 09.45 train, with a return at 13.40. A maximum of 60 passengers could be carried as far as Trawsfynydd where they were met by a bus to the nuclear power station for a guided tour.


Current status

The only part of the line in use today is the very short section between the two stations in Blaenau Ffestiniog. The section of line between Blaenau (GWR) and Trawsfynydd power station closed in 1998, although the track is protected and has remained in situ since. Much of the trackbed south of Trawsfynydd remains intact except for the section flooded by
Llyn Celyn Llyn Celyn () is a reservoir constructed between 1960 and 1965 in the valley of the River Tryweryn in Gwynedd, Wales. It measures roughly long by wide, and has a maximum depth of . It has the capacity to hold of water. It was originally ...
and some sections used to improve the
A4212 road A4 most often refers to: *A4 paper, a paper size defined by the ISO 216 standard, measuring 210 × 297 mm A4 and variants may also refer to: Science and mathematics * British NVC community A4 (''Hydrocharis morsus-ranae - Stratiotes aloide ...
. Several other sections are open as permissive paths. Many of the former stations are now in use as private residences.


Heritage railway plans


Trawsfynydd Railway Company

During 2016, the Trawsfynydd Railway Company was formed under the ownership of Colin Dale and with the use of volunteer labour, began to clear the line to Trawsfynydd Lake railway station which they proposed to be their terminus. They also intended to re-open Maentwrog Road, Llan Ffestiniog, a halt at Cwm Teigl and at Manod, en route. The clearing of the line was sanctioned by the owner of the trackbed, Network Rail and by 10 October 2016, more than six productive days had been achieved. Also, a bid was unsuccessfully made for
DB Cargo DB Cargo (previously known as Railion and DB Schenker Rail) is an international transport and logistics company. It is responsible for all of the rail freight transport activities of the German railway company Deutsche Bahn (the DB Group) bo ...
's Class 08 locomotive No. 08757 from Crewe which would cost £19,600. A crowd funding site was launched to this end. In August of 2017 Network Rail took the decision to revoke the licence issued to Trawsfynydd Railway Company for clearing the line following an investigation which found several breaches of the terms and conditions of the licence agreement. The company dissolved in December 2018 following the death of the owner.


Blaenau Ffestiniog and Trawsfynydd Railway Society

A separate volunteer society, the Blaenau Ffestiniog and Trawsfynydd Railway Society, kept a watching brief in the background to the Trawsfynydd Railway Company. After it lost its licence to clear the line, the Blaenau Ffestiniog and Trawsfynydd Railway Society stepped in with the goal of developing its own plans to restore the line in a manner acceptable to Network Rail and other stakeholders. A new interim committee was formed through co-opting existing committee members from the Trawsfynydd Railway Company. It held its first and only AGM on 3 February 2019 to discuss how to take the next steps towards restoring the line. Plans included changing the Society into the Bala and Ffestiniog Railway Heritage Trust.


Bala and Festiniog Railway Heritage Trust

The outcome of the AGM was to disband the existing Blaenau Ffestiniog and Trawsfynydd Railway Society and replace it with a limited company named the Bala and Festiniog Railway Heritage Trust. It would be run by an elected committee which had the mandate to preserve the history of the old line between Bala and Ffestiniog and to explore options of how to restore the line between Trawsfynydd and Ffestiniog to operational use. Members of the committee reiterated that this would involve much paperwork before any tangible progress was made on the physical infrastructure once an agreement is obtained from Network Rail.


See also


Map of places on 'Bala and Festiniog Railway' compiled from this article


References


Notes


Sources

* *



* * {{Historical Welsh railway companies Closed railway lines in Wales Railway companies established in 1873 Railway lines opened in 1882 Rail transport in Gwynedd Standard gauge railways in Wales 1873 establishments in Wales 1961 disestablishments in Wales