Baglihar Dam (Hindi: ''Baglihār Bāndh''), also known as Baglihar Hydroelectric Power Project, is a
run-of-the-river
Run-of-river hydroelectricity (ROR) or run-of-the-river hydroelectricity is a type of hydroelectric generation plant whereby little or no water storage is provided. Run-of-the-river power plants may have no water storage at all or a limited amou ...
power project on the
Chenab River
The Chenab River () is a major river that flows in India and Pakistan, and is one of the 5 major rivers of the Punjab region. It is formed by the union of two headwaters, Chandra and Bhaga, which rise in the upper Himalayas in the Lahaul regi ...
in the
Ramban district of
Jammu and Kashmir Jammu and Kashmir may refer to:
* Kashmir, the northernmost geographical region of the Indian subcontinent
* Jammu and Kashmir (union territory), a region administered by India as a union territory
* Jammu and Kashmir (state), a region administered ...
, India. The first power project executed by the Jammu and Kashmir Power Development Corporation, it was conceived in 1992 and approved in 1996, with construction begun in 1999. The project was estimated to cost US$1 billion. The project consists of two-stage of 450MW each. The first stage of the project was completed in 2008-09 and was dedicated to the nation by the Prime Minister
Manmohan Singh
Manmohan Singh (; born 26 September 1932) is an Indian politician, economist and statesman who served as the 13th prime minister of India from 2004 to 2014. He is also the third longest-serving prime minister after Jawaharlal Nehru and Indir ...
of
India
India, officially the Republic of India (Hindi: ), is a country in South Asia. It is the seventh-largest country by area, the second-most populous country, and the most populous democracy in the world. Bounded by the Indian Ocean on the so ...
. The second stage of the project was completed in 2015–16, and was subsequently dedicated to the nation by the Prime Minister
Narendra Modi
Narendra Damodardas Modi (; born 17 September 1950) is an Indian politician serving as the 14th and current Prime Minister of India since 2014. Modi was the Chief Minister of Gujarat from 2001 to 2014 and is the Member of Parliament from ...
of
India
India, officially the Republic of India (Hindi: ), is a country in South Asia. It is the seventh-largest country by area, the second-most populous country, and the most populous democracy in the world. Bounded by the Indian Ocean on the so ...
.
[Baglihar Briefing]
Kashmir Life, 11 November 2015.
[
]
Indus Waters dispute
After construction began in 1999,
Pakistan
Pakistan ( ur, ), officially the Islamic Republic of Pakistan ( ur, , label=none), is a country in South Asia. It is the world's List of countries and dependencies by population, fifth-most populous country, with a population of almost 24 ...
objected that the design parameters of the Baglihar project violated the
Indus Water Treaty
The Indus Water Treaty (IWT) is a water-distribution treaty between India and Pakistan, arranged and negotiated by the World Bank, to use the water available in the Indus River and its tributaries. It was signed in Karachi on 19 September 1960 b ...
of 1960. The treaty provides for India to make use of the three western rivers of the Indus River system, including Chenab River, in constrained ways. India can only establish
run-of-the-river
Run-of-river hydroelectricity (ROR) or run-of-the-river hydroelectricity is a type of hydroelectric generation plant whereby little or no water storage is provided. Run-of-the-river power plants may have no water storage at all or a limited amou ...
power projects with limited reservoir capacity and limited control over flows needed for feasible power generation. Availing this provision, India planned for several run-of-the-river projects, with Pakistan objecting to them. In the case of the Baglihar and
Kishanganga Hydroelectric Plant
The Kishanganga Hydroelectric Project is a run-of-the-river hydroelectric scheme in Jammu and Kashmir, India. Its dam diverts water from the Kishanganga River to a power plant in the Jhelum River basin. It is located near Dharmahama Village, no ...
s, Pakistan claimed that some design parameters were too lax. It claimed that they were not needed for feasible power generation but for gaining an excessive ability to accelerate, decelerate or block the flow of the water, thus giving India a strategic leverage in times of political tension or war.
During 1999-2004 India and Pakistan held several rounds of talks on the design of the project, but could not reach an agreement. After the failure of talks on 18 January 2005, Pakistan raised six objections to the
World Bank
The World Bank is an international financial institution that provides loans and grants to the governments of low- and middle-income countries for the purpose of pursuing capital projects. The World Bank is the collective name for the Interna ...
, a broker and signatory of Indus Water Treaty. In April 2005 the World Bank determined the Pakistani claim as a ‘Difference’, a classification that is in-between the less serious ‘Question’ and the more serious ‘Dispute’. In May 2005, it appointed Professor Raymond Lafitte, a Swiss civil engineer as a neutral expert to adjudicate the difference.
Lafitte declared his final verdict on 12 February 2007, in which he upheld some minor objections of Pakistan, requiring that pondage capacity be reduced by 13.5%, the height of dam be reduced by 1.5 meters, and power intake tunnels be raised by 3 meters, thereby limiting some flow control capabilities of the earlier design. However, he rejected Pakistani objections on height and gated control of the
spillway
A spillway is a structure used to provide the controlled release of water downstream from a dam or levee, typically into the riverbed of the dammed river itself. In the United Kingdom, they may be known as overflow channels. Spillways ensure tha ...
, declaring that these featurees conformed to the engineering norms of the day. Pakistan government expressed its disappointment at the outcome.
The verdict acknowledged India's right to construct 'gated spillways' under Indus Water Treaty. The report allowed
pondage Pondage usually refers to the comparably small water storage behind the weir of a run-of-the-river hydroelectric power plant. Such a power plant has considerably less storage than the reservoirs of large dams and conventional hydroelectric stations ...
of 32.56 million cubic meters against India's demand for 37.5 million cubic metres. The report also recommended reducing the height of freeboard from 1.5 m to nil and surcharge storage unchanged at 3 m. The verdict permitted drawdown flushing to prevent silt accumulation in the reservoir which has enhanced the life of the reservoir to above 80 years. Without drawdown flushing, the reservoir would have been completely silted in 13 years period by 2017.
On 1 June 2010, India and Pakistan had a meeting of the
Permanent Indus Commission
The Permanent Indus Commission (PIC) is a bilateral commission consisting of officials from India and Pakistan, created to implement and manage the goals and objectives and outlines of the Indus Waters Treaty (IWT).
Indus Waters Treaty
After pro ...
, where they resolved the issue relating to the initial filling of Baglihar dam. According to
PTI PTI may refer to:
Arts and entertainment
* ''Pardon the Interruption'', an American television sports show
* PTI, a musical group on the WTII Records label
Organizations
* Pacific Torah Institute, a yeshiva high school in Vancouver, British Columb ...
, "the two sides discussed the issue at length without any prejudice to each other's stand...Indian and Pakistani teams resolved the issue relating to the initial filling of Baglihar dam after discussions." Pakistan also agreed not to raise the issue further.
[
Gargi Parsai]
India, Pak resolve matters relating to filling of Baglihar dam
Hindustan Times, 1 June 2010.
See also
*
Ratle Hydroelectric Plant
The Ratle Hydroelectric Plant is a run-of-the-river hydroelectric power station currently under construction on the Chenab River, downstream of the village near Drabshalla in Kishtwar district of the Indian Union Territory of Jammu and Kash ...
– under construction upstream
*
Kishanganga Hydroelectric Plant
The Kishanganga Hydroelectric Project is a run-of-the-river hydroelectric scheme in Jammu and Kashmir, India. Its dam diverts water from the Kishanganga River to a power plant in the Jhelum River basin. It is located near Dharmahama Village, no ...
*
Salal Hydroelectric Power Station
Salal Dam ( hi, सलाल बाँध ''Salāl Bāndh''), also known as Salal Hydroelectric Power Station, is a run-of-the-river hydropower project on the Chenab River in the Reasi district of the Jammu and Kashmir. It was the first hydropow ...
*
Rivers of Jammu and Kashmir
Jammu and Kashmir (union territory), Jammu and Kashmir has many lakes, rivers, and glaciers. Significant rivers that flow through Jammu & Kashmir from the Himalayas are Jhelum River, Jhelum, Chenab River, Chenab and Ravi River, Ravi These river b ...
References
Bibliography
*
*
* }
*
*
External links
*
Baglihar Dam cleared by neutral expert Government of India press release, 12 February 2007.
PM’s opening remarks at the Press Conference Government of India, 10 October 2008.
{{Power Plants of Jammu and Kashmir
Dams in Jammu and Kashmir
Hydroelectric power stations in Jammu and Kashmir
Run-of-the-river power stations
Dams on the Chenab River
Dams completed in 2004
Doda district
Energy infrastructure completed in 2008
Chenab Valley
Tourist attractions in Doda district
2008 establishments in Jammu and Kashmir