Auckland railway electrification occurred in phases as part of investment in a new infrastructure for Auckland's urban railway network.
Electrification Electrification is the process of powering by electricity and, in many contexts, the introduction of such power by changing over from an earlier power source. The broad meaning of the term, such as in the history of technology, economic histo ...
of the network had been proposed for several decades. Installation started in the late 2000s after funds were approved from a combination of regional (
Auckland Regional Council The Auckland Regional Council (ARC) was the regional council (one of the former local government authorities) of the Auckland Region. Its predecessor the Auckland Regional Authority (ARA) was formed in 1963 and became the ARC in 1989. The ARC ...
, later
Auckland Council Auckland Council ( mi, Te Kaunihera o Tāmaki Makaurau) is the local government council for the Auckland Region in New Zealand. It is a territorial authority that has the responsibilities, duties and powers of a regional council and so is a ...
) and central government (
NZ Transport Agency Waka Kotahi NZ Transport Agency (commonly known as Waka Kotahi, and abbreviated as NZTA) is a New Zealand Crown entity tasked with promoting safe and functional transport by land, including the responsibility for driver and vehicle licensing, an ...
) budgets. In the 2007 budget the
Fifth Labour government The Fifth Labour Government of New Zealand was the government of New Zealand from 10 December 1999 to 19 November 2008. Labour Party leader Helen Clark negotiated a coalition with Jim Anderton, leader of the Alliance Party. While undertaking ...
announced that Auckland suburban railway lines from Swanson in the west to Papakura in the south and including the Manukau and Onehunga branch lines would be electrified at . Diesel DMU services would remain for Waitakere and perhaps Huapai and Pukekohe. A 2013 announcement said that because of cost, bus services would remain between Waitakere and Swanson, and did not mention an extension to Huapai. The $80 million contract for the electrification infrastructure was awarded on 14 January 2010 to an Australian and New Zealand consortium (HILOR); Hawkins Infrastructure of Parnell and Laing O'Rourke of Australia. Between Papakura, Newmarket, Britomart and Swanson there were 196 single-track kilometres. The overhead infrastructure design was to be based on
Balfour Beatty Balfour Beatty plc () is an international infrastructure group based in the United Kingdom with capabilities in construction services, support services and infrastructure investments. A constituent of the FTSE 250 Index, Balfour Beatty works acr ...
's 3B English design. The contract for 57 3-car EMUs was awarded on 6 October 2011 to Spanish manufacturer CAF. The first public electric service was on 28 April 2014 on the Onehunga Line. Since July 2015, all services have been electric with the exception of Papakura to Pukekohe, which runs a diesel shuttle service, and Swanson to Waitakere, which runs a
rail replacement bus A rail replacement bus service uses buses to replace a passenger train service on a temporary or permanent basis. The train service that is replaced may be of any type such as light rail, tram, streetcar, commuter rail, regional rail or heavy ...
service. Electrification from Papakura to Pukekohe has long been proposed, but in the interim, Auckland Council intended to buy from CAF 17 EMUs equipped with batteries (BEMU) that would have extended electric unit services to Pukekohe. In November 2017, shortly after the change of government at the 2017 general election, it was announced that the proposed BEMU order had been cancelled in preference for 15 further AM class units. The rationale for this became clear in late April 2018 when electrification between Papakura and Pukekohe was announced as part of the $28 billion Auckland Transport Alignment Project. The New Zealand Upgrade Programme announced on 30 January 2020 includes $371 million for Papakura to Pukekohe electrification.


Specifications


Power supply

All four suburban lines between Swanson in the west and Papakura in the south are electrified at ,ARC, Rail Electrification
/ref> the same voltage as the
North Island Main Trunk The North Island Main Trunk (NIMT) is the main railway line in the North Island of New Zealand, connecting the capital city Wellington with the country's largest city, Auckland. The line is long, built to the New Zealand rail gauge of and se ...
between Te Rapa and Palmerston North. In contrast, the Wellington suburban network (electrified 1938–55) uses . About 3,500 masts were installed as part of the project. The Onehunga Line was the first line to be commissioned. The system is supplied by two connections to Transpower's 220 kV national grid, one at the former
Southdown Power Station Southdown Power Station was a natural gas-fired combined cycle gas turbine cogeneration power station in Southdown, a suburb in southern Auckland, New Zealand. When operational, it was New Zealand's northernmost power station with a capacity exce ...
and the other at Transpower's Penrose substation. Both connections are duplicated (Penrose has limited duplication due to having only one 220/25 kV transformer), and one connection can supply the entire network if the other one fails, creating a high level of redundancy. KiwiRail said electrification would use less than 1% of Auckland's electricity capacity. In conjunction with the electrification to Pukekohe, a third connection for the system is planned, supplied from Transpower's Drury substation.


Rolling stock

The decision to electrify was partly prompted by the ageing diesel train fleet becoming unreliable. The fleet comprised diesel multiple units (DMUs) bought second-hand from Perth, Australia, and rebuilt British Rail Mark II carriages in push/pull configuration with DC and DFT locomotives; the Auckland Regional Transport Authority established that electric trains would be cheaper to run long term. Around the world, cities with high-frequency metropolitan passenger rail services use electric trains, partly because of their quieter operation, faster travel between stations and greater environmental benefits. After electrification a small number of diesel trains were retained to provide shuttle services between Papakura and Pukekohe.21st century public transport for Auckland
- Auckland Regional Transport Authority, Thursday 17 May 2007
In May 2012, the possibility of extending electrification to Pukekohe was to be investigated by Auckland Transport. The EMUs were delivered from 2013, with the last units in 2016. In June 2013, it was confirmed they would be classified AM class (standing for Auckland Metro), with the motor car classified AMA, trailer car AMT, and motor/pantograph car AMP. In July 2017, Auckland Council's Finance & Performance Committee approved in principle an order from CAF of 17 EMUs equipped with batteries (BEMU) that would extend electric unit services to Pukekohe. The approval was subject to the New Zealand Transport Agency agreeing to fund at least 50% of the cost of the order and the future operation; the new units were expected to start operating in 2019. In November 2017, it was announced that the proposed BEMU order had been cancelled and another 15 AM class units would be ordered. The rationale for this became clear in late April 2018 when electrification between Papakura and Pukekohe was announced as part of the $28 billion Auckland Transport Alignment Project.


Other infrastructure


Crossings, bridges and tunnels

There were 31 public level crossings between Swanson and Pukekohe and 8 on the Onehunga Branch. With electrification there is a need to safeguard crossings, since electric trains are quieter and more frequent. This includes bridges or tunnels in some cases, and the closure of small suburban street crossings in others. Height restrictions of 4.25 metres or 5.0 metres were imposed to keep vehicles clear of overhead wires. The Broadway overbridge in Newmarket and Parnell Tunnel were among the first of about 40 structures that needed modification before electric trains could run. Tracks were lowered in
Purewa Tunnel Purewa Tunnel is a rail tunnel in Auckland, New Zealand. It is on the North Island Main Trunk line and is located in the suburb of Saint Johns, to the west of Glen Innes. The tunnel is concrete-lined. Eastern Line passenger services operat ...
on the Eastern Line.


Signalling upgrades

The electrification was completed in conjunction with a NZ$90 million upgrade to the signalling system. As the AC return current is through the rails, insulated rail joints had to be removed (or circumvented by joining rails with a bond wire). The old signalling system used track circuits with insulated rail joints; these had to be installed initially for the duplication of the Western Line. The new European Train Control System (ETCS, Mark II) uses train detection by axle counters.


Station upgrades

The planning of the Parnell station and upgrades to existing stations at Ellerslie (in combination with motorway works),
Onehunga Onehunga is a suburb of Auckland in New Zealand and the location of the Port of Onehunga, the city's small port on the Manukau Harbour. It is south of the city centre, close to the volcanic cone of Maungakiekie / One Tree Hill. Onehunga is a ...
(lengthening for 3-car units) and Mount Albert (amenity upgrades), took into consideration the electrification of the network, so that modifications were not needed later.


Maintenance depot

Funding arrangements for the rolling stock purchase included the construction of a maintenance depot and stabling facilities. After looking at potential sites, 4.4 hectares of the old Winstone Quarry in Wiri (next to the South-Western Expressway, near the closed Wiri Station, and bordered by Roscommon and Wiri Station Roads) was selected, being large enough to house all the facilities required and adjacent to the NIMT railway line. Significant earthworks to prepare the site commenced in January 2011 and in May 2012 a NZ$40 million contract to construct the facility was awarded to Downer New Zealand Limited. The facility was officially opened on 5 July 2013 and joint operational control was handed over to the train operator Transdev Auckland Limited and train supplier & maintenance operator CAF on 28 August 2013. The cost of the depot including land, construction and facility equipment was approximately NZ$100 million. The facility includes 6 kilometres of sidings and a 7,650 square metre depot building consisting of office facilities and the main workshop where servicing of the 57 electric trains takes place. The workshop has seven maintenance berths and has overhead gantry cranes and jacking systems for lifting the trains, high-level platforms to access train roofs, under-floor pits and a wheel lathe. There are an automatic train wash and covered platforms to facilitate cleaning of the inside of the trains. The facility has been future proofed to maintain a fleet of up to 109 electric trains. The ground floor offices house CAF and the first floor Transdev and staff amenities. The Transdev offices include the depot control office and driver training facilities, which include two train simulators. Each simulator is laid out exactly like the driver's cab with a large flat screen display in place of the windscreen that displays the view that the driver would see from the cab. The display is programmed with the Auckland railway network, filmed in 2012 and converted into video graphics. The simulator can be set to simulate daytime or night-time and includes a range of weather conditions, and it can simulate faults in the train and emergency situations. Train movements within the facility are controlled by Transdev staff from the depot control office. The stabling capacity is 28 electric trains. There are other stabling yards at
Henderson Henderson may refer to: People * Henderson (surname), description of the surname, and a list of people with the surname *Clan Henderson, a Scottish clan Places Argentina *Henderson, Buenos Aires Australia *Henderson, Western Australia Canada * ...
,
The Strand Station The Strand Station, also referred to as Auckland Strand Station, is a railway station located on the eastern edge of the Auckland CBD. It serves as the long-distance railway station for Auckland. It is the northern terminus of the Northern E ...
, and
Papakura Papakura is a southern suburb of Auckland, in northern New Zealand. It is located on the shores of the Pahurehure Inlet, approximately 32 kilometres south of the Auckland CBD. It is under the authority of the Auckland Council. Papakura is a M� ...
.


Funding

The Auckland Regional Council envisaged that a regional fuel tax of five cents per litre would be required to pay for the trains, the upgrade of other rolling stock, above-track infrastructure development including stations and maintenance facilities, ferry terminal upgrades and other transport infrastructure including integrated smartcard ticketing, and the council was to fund the
Auckland Regional Transport Authority The Auckland Regional Transport Authority (ARTA) was the central co-ordinating agency for transport (especially but not only public transport) in the Auckland Region of New Zealand from 2004 to 2010. In this role, ARTA provided public transport s ...
to buy electric trains and to operate services, and to provide stabling and maintenance facilities. The infrastructure was to be paid from national funds. However, the Fifth National Government cancelled the proposed tax, with the electrification to be paid for by central government. This move was heavily criticised for leaving the electrification in doubt for a time, for delaying parts of the project, such as train tendering, and for putting control of Auckland public transport into Wellington's hands. In late 2009, the government confirmed that NZ$500 million in loans would be extended to
KiwiRail KiwiRail Holdings Limited is a New Zealand state-owned enterprise responsible for rail operations in New Zealand, and operates inter-island ferries. Trading as KiwiRail and headquartered in Wellington, New Zealand, KiwiRail is the largest rail ...
to enable it to proceed with tendering for the
rolling stock The term rolling stock in the rail transport industry refers to railway vehicles, including both powered and unpowered vehicles: for example, locomotives, freight and passenger cars (or coaches), and non-revenue cars. Passenger vehicles ca ...
, a process that the cancellation of the fuel tax had interrupted by at least half a year.
$500m electric train boost 'historical' for Auckland - ARC
' - ''
The New Zealand Herald ''The New Zealand Herald'' is a daily newspaper published in Auckland, New Zealand, owned by New Zealand Media and Entertainment, and considered a newspaper of record for New Zealand. It has the largest newspaper circulation of all newspape ...
'', Tuesday 24 November 2009
The fact that the money was only a loan, with no means provided for Auckland or KiwiRail to raise extra funds to repay it (as was intended to be done with the regional fuel tax), was criticised strongly in Auckland, as it would mean that Auckland would pay for the trains yet not own them. In mid-2011, after long negotiations between
Auckland Council Auckland Council ( mi, Te Kaunihera o Tāmaki Makaurau) is the local government council for the Auckland Region in New Zealand. It is a territorial authority that has the responsibilities, duties and powers of a regional council and so is a ...
/
Auckland Transport Auckland Transport (AT) is the council-controlled organisation (CCO) of Auckland Council responsible for transport projects and services. It was established by section 38 of the Local Government (Auckland Council) Act 2009, and operates under ...
and the government, it was announced that the trains would be owned by Auckland, with Auckland paying approximately half of the cost from rates, and paying annual track access charges to
KiwiRail KiwiRail Holdings Limited is a New Zealand state-owned enterprise responsible for rail operations in New Zealand, and operates inter-island ferries. Trading as KiwiRail and headquartered in Wellington, New Zealand, KiwiRail is the largest rail ...
and any potential purchase price increases as the winning tenderer is finalised.


Timeline

;2007, Electrification announced *17 May: As part of the 2007 New Zealand budget it is announced that electrification would proceed, to be completed by 2013. ;2008, Regional fuel tax law passed *3 July: A law is passed allowing regional fuel taxes to fund large capital projects, of up to 10c a litre but limited to 2c in 2009 and 5c in 2010. ;2009, Regional fuel tax cancelled *Early 2009: Before the regional fuel tax can be implemented, a change in government sees the incoming National government cancel the fuel tax, though electrification is still to be funded. *November 2009: The government confirms NZ$500 million in loans to KiwiRail to allow the interrupted purchasing process for the electric trains to continue. It is later clarified that Auckland would have to repay the loan, without a mechanism to fund the extra cost. After negotiations between central and local government, this is reduced in severity by government providing over half of the purchase cost as a subsidy, with the rest still to be paid from rates. ;2010, Electrification contract awarded *14 January: KiwiRail announces that it has awarded the contract for electrification to a consortium (HILOR) of Hawkins Infrastructure, a division of New Zealand company
Hawkins Construction Hawkins may refer to: Places United States * Hawkins, Idaho, an unincorporated community * Hawkins Ranch, a historic ranch in Matagorda County, Texas * Hawkins, Texas * Hawkins, Wisconsin, a village * Hawkins (town), Wisconsin, a town * Hawkins Co ...
, and
Laing O'Rourke Laing O'Rourke is a multinational construction company headquartered in Dartford, England. It was founded in 1978 by Ray O'Rourke. It is the largest privately owned construction company in the United Kingdom. History The company was founded by ...
Australia, for NZ$80 million. ;2011, Construction of EMU maintenance and stabling depot begins *4.4 hectares of the old Winstone Quarry in Wiri is selected as the site of a maintenance and stabling facility for the new trains. Earthworks preparing the site start in January 2011 and construction of the 7650 sq m building and the six kilometres of sidings in the stabling area commence in May 2012. *6 October 2011, CAF is confirmed as the successful tenderer, for approximately NZ$400 million. ;2013, Wiri EMU maintenance and stabling depot opened *5 July: Auckland Mayor
Len Brown Leonard Charles Brown (born 1 October 1956)) is a former mayor of Auckland, New Zealand, and former head of the Auckland Council. He won the 2010 Auckland mayoral election on 9 October 2010 and was sworn in as Mayor of Auckland on 1 Novembe ...
officially opens the facility. *26 August: The first train (unit number AM 103) is delivered by truck to the depot for certification. The train is officially unveiled during a ceremony at the depot on 12 September. ;2014 Scheduled EMU passenger services begin *28 April: The first EMU passenger trains enter regular service between Britomart and Onehunga on the Onehunga Line. Three EMUs are used that day with unit AM 129 being the first in service, departing Onehunga at 05:46 followed by AM 116 at 06:10 and AM 103 used as a standby spare. ;July 2015, Full electric service *20 July: Electric trains begin operating all services between Swanson and Papakura, seven days a week.


Stages of completion

KiwiRail announced the works would be implemented in five phases: Stage 1 * Southern line, Otahuhu- Britomart * Western line, Newmarket- Morningside * Onehunga Branch. Stage 2 *Western Line, Morningside-
Swanson Swanson is a brand of TV dinners, broths, and canned poultry made for the North American and Hong Kong markets. The former "Swanson Company" was founded in Omaha, Nebraska, where it developed improvements of the frozen dinner. The TV dinner b ...
Stage 3 *Southern Line, Otahuhu- Puhinui *
Manukau Branch The Manukau Branch is a spur railway line off the North Island Main Trunk railway from Wiri to Manukau City Centre in Auckland, New Zealand. It is the first fully new section of railway line constructed in Auckland since the Eastern Line in ...
. Stage 4 *Southern Line, Puhinui-
Papakura Papakura is a southern suburb of Auckland, in northern New Zealand. It is located on the shores of the Pahurehure Inlet, approximately 32 kilometres south of the Auckland CBD. It is under the authority of the Auckland Council. Papakura is a M� ...
. Stage 5 * Eastern line, WestfieldQuay Park Junction (near Britomart)


Progress

During the summer 2011-2012 shutdown, the approaches to Britomart were rebuilt to allow for electrification, masts installed and holes bored, and wiring completed in some areas. During the 2013-2014 shut-down, the complex job of wiring Quay Park Junction, The Strand stabling facility and Britomart was completed. By January 2014 wires had been installed: *Western Line: Swanson-Mount Albert, Newmarket-Britomart; *Southern Line: Britomart-Papakura; *Eastern Line: Britomart-Purewa Tunnel south end; *
Manukau Branch The Manukau Branch is a spur railway line off the North Island Main Trunk railway from Wiri to Manukau City Centre in Auckland, New Zealand. It is the first fully new section of railway line constructed in Auckland since the Eastern Line in ...
; *Onehunga Branch. Services were planned to start during April 2014 and the first scheduled electric train service (from Britomart to Onehunga) took place on 28 April 2014. The project was completed on 20 July 2015 with full electric train service across the network.


Future expansion

Two sections of the
AT Metro AT Metro is the public transport brand in Auckland, New Zealand, managed by Auckland Transport. It was launched in December 2014, following the decommissioning of the MAXX brand with updated bus and train liveries, staff uniforms, wayfinding si ...
network are not electrified. The section of the Southern Line between Pukekohe and Papakura, which is a shuttle service operated by
ADL/ADC class diesel multiple unit The ADL class is a class of diesel multiple units that were last operated by Auckland One Rail on the suburban rail network in Auckland, New Zealand. Originally built in the early 1980s by A Goninan & Co for Westrail of Western Australia, they ...
s. The Draft future urban land supply strategy states that electrification of the network would be extended southwards to Pukekohe once the special housing area at Paerata is opened up in the "second decade" of the plan, that is by 2030. A petition for the electrification to be undertaken sooner was started by a local resident of Pukekohe, and the matter was discussed by both main parties during campaigning for the 2017 general election. In preparation for future electrification, KiwiRail has been consulting with Transpower about a third power supply for its network from the Drury 220 kV switching station. In 2020, the government announced $371 million in funding to extend electrification from Papakura to Pukekohe, with the upgrade expected to take two to three years (see also New Zealand Upgrade Programme). There has been criticism that KiwiRail is negotiating with two overseas-owned companies (''McConnell Dowell'', South Africa and ''John Holland'', China) to carry out the contract, which is expected to provide over 200 jobs. This work is to commence in 2020. The section of the Western Line between
Swanson Swanson is a brand of TV dinners, broths, and canned poultry made for the North American and Hong Kong markets. The former "Swanson Company" was founded in Omaha, Nebraska, where it developed improvements of the frozen dinner. The TV dinner b ...
and Waitakere. Electrification was not carried out due to the low roof height of the Waitakere Tunnel and because enlarging it was considered an to be an unjustified expense considering the low passenger numbers to Waitakere Station. Rail services to Waitakere were withdrawn when electric services commenced on the rest of the Western Line. Waitakere Village is now served by bus services connecting to Swanson and Henderson. The
City Rail Link The City Rail Link (CRL) is a rail project currently under construction in Auckland, New Zealand. The project consists of a 3.5 km long double-track rail tunnel underneath Auckland's city centre, between Britomart Transport Centre and M ...
, which is scheduled to open in 2023, will be electrified from the time of its opening, and it is likely that any future expansions of the rail network within Auckland would be electrified from the outset.


Further reading

The electrification project and associated works were described in five comprehensive articles by Ken Haydock in the journal ''New Zealand Railfan:''ISSN 1173-2229 *Part 1: ''Introduction and civil engineering projects on the Western Line'' (March 2014 Volume 20 No 2, pages 24–37) *Part 2: ''Civil engineering projects on the NIMT, North Auckland Line and the Newmarket, Onehunga and Manakau Branches'' (June 2014 Volume 20 No 3, pages 53–68) *Part 3: ''The Auckland Metro Re-signalling Project'' (December 2014 Volume 21 No 1, pages 52–64) *Part 4: ''The erection of the overhead line equipment'' (March 2015 Volume 21 No 2, pages 50–64) *Part 5: ''The erection of the overhead line equipment and power supply is completed'' (June 2015 Volume 21 No 3, pages 45–58)


See also

* Railway electrification in New Zealand * Public transport in Auckland * Transport in Auckland *
Britomart Transport Centre Britomart Transport Centre, also known as Britomart railway station, is the public transport hub in the central business district of Auckland and the northern terminus of the North Island Main Trunk railway line. It combines a railway station ...
*
List of Auckland railway stations This is a list of the railway stations in the public transport network of Auckland. It includes closed and planned stations. Auckland has 13 fare zones, with some zone overlap areas. The routes shown pass into and out of central, western, eas ...