HOME

TheInfoList



OR:

Ashington railway station was a station on the branch of the Blyth and Tyne Railway network which served the town of
Ashington Ashington is a town and civil parish in Northumberland, England, with a population of 27,864 at the 2011 Census. It was once a centre of the coal mining industry. The town is north of Newcastle upon Tyne, west of the A189 and bordered to the ...
in
Northumberland Northumberland () is a county in Northern England, one of two counties in England which border with Scotland. Notable landmarks in the county include Alnwick Castle, Bamburgh Castle, Hadrian's Wall and Hexham Abbey. It is bordered by land ...
, North East England. The station was closed by British Railways in 1964, but it has been the subject of a reopening campaign since at least the 1990s.


History

Ashington station was opened by the Blyth and Tyne Railway in 1872 as Hirst (for Ashington). The North Eastern Railway took over the Blyth and Tyne Railway in 1874, the NER became part of the London and North Eastern Railway in the
1923 grouping The Railways Act 1921 (c. 55), also known as the Grouping Act, was an Act of Parliament enacted by the British government and intended to stem the losses being made by many of the country's 120 railway companies, by "grouping" them into four la ...
and the station passed to the
North Eastern Region of British Railways The North Eastern Region was a region of British Railways from 1948, whose operating area could be identified by the orange signs and colour schemes that adorned its stations and other railway buildings. It was merged with the Eastern Region i ...
on nationalisation in 1948. British Railways withdrew passenger services in 1964 as part of the ''
Reshaping of British Railways The Beeching cuts (also Beeching Axe) was a plan to increase the efficiency of the nationalised railway system in Great Britain. The plan was outlined in two reports: ''The Reshaping of British Railways'' (1963) and ''The Development of the ...
''.


The site today

The line through the former station is still used for freight. Ashington signal box was closed on 14 February 2010 with the removal of the main line crossover. The signal box was demolished over the weekend of 10–11 August 2013. The northbound platform was demolished in October 2022 to make way for the new Northumberland Line platform.


Reopening proposals

Proposals to reintroduce passenger rail services to the currently freight-only section of the former Blyth and Tyne Railway system have been discussed since the 1990s. In the early 2010s, Northumberland County Council (NCC) became interested in the proposals, commissioning
Network Rail Network Rail Limited is the owner (via its subsidiary Network Rail Infrastructure Limited, which was known as Railtrack plc before 2002) and infrastructure manager of most of the railway network in Great Britain. Network Rail is an "arm's leng ...
to complete a GRIP 1 study to examine the best options for the scheme in June 2013. This report was published in March 2014 and was followed in June 2015 with the commissioning of a more detailed GRIP 2 study at a cost of £850,000. The GRIP 2 study, published in October 2016, confirmed that the reintroduction of a frequent seven-day a week passenger service between Newcastle, Ashington and possibly a new terminus to the east, at , was feasible and could provide economic benefits of £70 million with more than 380,000 people using the line each year by 2034. Despite a change in the political leadership of Northumberland County Council following the 2017 local elections the authority continued to develop the project, encouraged by the Department for Transport's November 2017 report, ''A Strategic Vision for Rail'', which named the line as a possible candidate for a future reintroduction of passenger services. Consequentially, NCC commissioned a further interim study in November 2017 (dubbed ''GRIP 2B'') to determine whether high costs and long timescales identified in the GRIP 2 Study could be reduced by reducing the initial scope of the project, but the report failed to deliver on this. Nonetheless, the county council has continued to develop the project, hiring
AECOM AECOM (, ; formerly AECOM Technology Corporation) is an American multinational infrastructure consulting firm. AECOM has approximately 51,000 employees, and is number 157 on the 2019 Fortune 500 list. The company's official name from 1990 t ...
and SLC Rail as contractors to develop the scheme on their behalf in 2018 and allocating an additional £3.46 million in funding for a further business case and detailed design study (equivalent to GRIP 3) in February 2019. Revised plans were revealed in July 2019 which were reduced in scope from the 2016 GRIP 2 study and proposed 4-phase project to reduce the initial cost of the scheme. Phase 1 (at an estimated cost of £90 million) would have seen hourly passenger trains return to a reopened Ashington station and new turn-back facilities provided to allow trains to terminate there while later phases would have added additional stations and the infrastructure upgrades provided elsewhere on the line to provide a half-hourly frequency. However, in August 2020, it was reported that these four proposed phases might be merged into a single one. The North East Joint Transport Committee's bid for £377 million of funding from the UK Government's £1.28 billion ''Transforming Cities Fund'', submitted on 20 June 2019, includes £99 million to fund the reintroduction of passenger services between Newcastle and Ashington, while further work is ongoing to secure additional public and private investment for the project. The Department for Transport allocated an initial grant of £1.5 million towards the project costs in January 2020 which was supplemented by an allocation of £10 million of funds from Northumberland County Council the following month. This funding enabled AECOM to begin detailed on-site ground investigation works in October 2020. The allocation of a further £34 million of UK Government funding for the project in January 2021 enables the necessary land to be purchased, detailed designs to be prepared and some early preparatory and site works to begin. In January 2021, it was anticipated that the UK Government would fund the remainder of the project cost, estimated at £166 million as of January 2021, once the final phase of design works were completed. However, in April 2021, it was reported that government officials were seeking to reduce the cost of the project as part of the Department for Transport's ''Project SPEED'' initiative. It was reported that the cost-saving measures under consideration included and cutting initial service frequencies from two to one trains per hour and dropping the proposed Blyth Bebside station from initial project scope (although the latter option was later publicly ruled out by Minister for Railways Chris Heaton-Harris). A planning application for the new station was submitted to Northumberland County Council on 3 February 2021. The submitted planning documents indicate that the station will have a single bay platform, located on a short siding which will be recessed into part of the original down (northbound) platform (requiring its partial demolition). It will be accessible from the adjacent ''Station Yard Car Park'' (to be expanded to a capacity of 275 cars) and will be linked to the existing ''Wansbeck Square Footbridge'', via a new lift, to provide access to the eastern side of the through lines. Northumberland County Council submitted a
Transport and Works Act Order The Transport and Works Act 1992 (TWA) was established by the Parliament of the United Kingdom to provide a system by which the construction of rail transport, tramway, inland waterway and harbour infrastructure could proceed in the UK by ord ...
application to the Secretary of State for Transport Grant Shapps on 26 May 2021, which was approved on 27 June 2022. The council has been conferred certain additional powers deemed necessary for the new stations to be constructed and the line upgraded to carry regular passenger services. The new ''Ashington'' station will be constructed by the project's primary construction contractor,
Morgan Sindall Morgan Sindall Group plc is a leading British Construction & Regeneration group, headquartered in London employing around 6,700 employees and operating in the public, regulated and private sectors. It reports through six divisions of Constructio ...
. The main construction phase began in autumn 2022, enabling an opening date in 2024.


References


Sources

* * * * * * *


External links

*
Station on navigable 1946 O.S. map
{{Current rail infrastructure projects in the United Kingdom Disused railway stations in Northumberland Former North Eastern Railway (UK) stations Railway stations in Great Britain opened in 1872 Railway stations in Great Britain closed in 1964 Beeching closures in England Proposed railway stations in England Ashington