The Arlanda Line ( sv, Arlandabanan) is a long
railway Rail transport (also known as train transport) is a means of transport that transfers passengers and goods on wheeled vehicles running on rails, which are incorporated in tracks. In contrast to road transport, where the vehicles run on a pre ...
line which allows trains on the East Coast Line to reach
Stockholm Arlanda Airport Stockholm Arlanda Airport is an international airport located in the Sigtuna Municipality of Sweden, near the town of Märsta, north of Stockholm and nearly south-east of Uppsala. The airport is located within Stockholm County and the provi ...
in
Sigtuna Municipality Sigtuna Municipality (''Sigtuna kommun'') is a municipality in Stockholm County in east central Sweden. Its seat is located in the town of Märsta, approximately north of the Swedish capital, Stockholm. The municipality is a part of Metropol ...
, Sweden. The Arlanda Line branches from the East Coast Line at Rosersberg and rejoins again at Myrbacken. It is built for speeds of , is
electrified Electrification is the process of powering by electricity and, in many contexts, the introduction of such power by changing over from an earlier power source. The broad meaning of the term, such as in the history of technology, economic history ...
at and is double track. The section under the airport runs in a tunnel, and has three stations: Arlanda South, Arlanda Central and Arlanda North. The ''
Arlanda Express Arlanda Express is an airport rail link connecting Stockholm Central Station with the Stockholm Arlanda Airport outside Stockholm, Sweden. Operated by A-Train AB, the trip takes 18 minutes and runs four to six times per hour using seven X3 ele ...
'' operates four times per hour, increasing to six times per hour during rush hour, to and from
Stockholm Central Station Stockholm Central Station ( sv, Stockholms centralstation) is a railway station in Stockholm, Sweden. It is situated in the district of Norrmalm at Vasagatan/Central Plan. The station opened on 18 July 1871 and it had over 200,000 visitors da ...
, the largest railway station in Sweden and in the Nordic region. Operated by A-Train, the service uses seven X3 trains and calls at the north and south stations. The line is also served by 70 other regional and intercity trains daily, operated by SJ, SJ Norrlandståg and (with very limited service)
Upptåget Kollektivtrafikförvaltningen UL (English: Public transport administration UL) (formerly Upplands Lokaltrafik until 1 January 2012) is the integrated transport authority ( sv, Trafikhuvudman) responsible for public transport buses and trains at ...
, and since December 2012 also by Stockholm Commuter Rail. These all stop at Arlanda Central. In 1994, A-Train was awarded the right to build the line in a
public–private partnership A public–private partnership (PPP, 3P, or P3) is a long-term arrangement between a government and private sector institutions.Hodge, G. A and Greve, C. (2007), Public–Private Partnerships: An International Performance Review, Public Adminis ...
, where A-Train financed about half the 6 billion Swedish krona (SEK) to build the line. The private consortium was granted a 40-year permit to operate the line in exchange for all direct traffic and the right to collect usage fees from other train companies. The line opened in 1999 and A-Train holds the sole right to operate to Stockholm, and collects a fee from other train operators using the line. The line itself is owned by Arlandabanan Infrastructure AB, which is owned by the Ministry of Enterprise, Energy and Communications.


Service

The Arlanda Express is the main operator of the line and offers a direct service from Stockholm Central Station to Arlanda North Station and Arlanda South Station up to six times per hour. Travel time is 20 minutes using the company's seven X3 trains. Since 9 December 2012, Stockholm commuter rail trains stop at Arlanda Central every 30 minutes (60 minutes on weekend mornings and nights). It takes 38 minutes from Arlanda C to Stockholm C, and 18 minutes to Uppsala C. The station is also served by 70 daily long-distance trains operated by SJ. SJ operates northbound
X 2000 X 2000, also called SJ X2 or simply as X2, is an electric tilting train operated by SJ in Sweden. It was constructed by Kalmar Verkstad in Kalmar, Sweden (prior to the company being bought by Adtranz in 1996) and launched in 1990 as a ...
trains from Stockholm, which may continue southwards to destinations in southern Sweden. SJ Norrlandståg, a subsidiary of SJ, operates Norrlandståget ("The Norrland Train") with two daily connections from Stockholm to Narvik. From 2006 to 2012,
Upptåget Kollektivtrafikförvaltningen UL (English: Public transport administration UL) (formerly Upplands Lokaltrafik until 1 January 2012) is the integrated transport authority ( sv, Trafikhuvudman) responsible for public transport buses and trains at ...
operated a commuter train service every 30 minutes between
Upplands Väsby Upplands Väsby () is a locality and the seat of Upplands Väsby Municipality, Stockholm County, Sweden with 149,463 inhabitants in 2020. History The municipality has a long history with clear traces of settlements from the pre-Christian times ...
and
Uppsala Uppsala (, or all ending in , ; archaically spelled ''Upsala'') is the county seat of Uppsala County and the fourth-largest city in Sweden, after Stockholm, Gothenburg, and Malmö. It had 177,074 inhabitants in 2019. Located north of the c ...
via Arlanda C. At Upplands Väsby, passengers could transfer to Stockholm commuter rail. When Stockholm commuter rail started its service from
Älvsjö Älvsjö () is a district of the city of Stockholm Municipality in Sweden, located in the borough Älvsjö in Söderort. It has the biggest rentable facility in northern Europe called Stockholm International Fairs, and also the hotel Scandic T ...
( Tumba) to Uppsala C, Upptåget ended its commuter service, except for a few morning and night trains on weekends. In 2007, the line transported 4 million people, of which 2.7 million were air passengers who used the Arlanda Express, 0.6 million were employees at the airport, and 0.7 million traveled with other train operators. Between 1,200 and 1,500 passengers board and disembark Upptåget trains at the airport each day. There are no freight trains because of safety considerations in the underground station. Before construction there was a plan to transport aviation fuel to the airport, which was transported by truck from the port of Stockholm. Since 2006 the fuel is transported by train on the old line to
Märsta Märsta () is a suburb of Metropolitan Stockholm, a locality and the seat of Sigtuna Municipality, Stockholm County, Sweden with 27,034 inhabitants in 2015. The town is situated close to Stockholm's main international airport, Arlanda. Even though ...
and transported by pipeline to the airport.


History

Plans for an airport rail link from the central business district of Stockholm and the airport was launched in the early 1980s. The goal was to reduce road congestion and emissions while allowing Arlanda to keep increasing passenger numbers. The
Swedish Rail Administration , genre = , fate = , predecessor = Swedish State Railways , successor = Swedish Transport Administration , foundation = 1988 , founder = , defunct = 31 March 2010 , location_city ...
made a specific plan in the late 1980s which involved the construction of a branch from the existing East Coast Line. This resulted in a project plan which was launched in 1990, which specifically suggested Rosersberg and Odensala as the intersections with the existing line. The political decision to build the line was taken in 1993. Estimates at the time gave a ridership of 5.1 million passengers per year in 2005. The Swedish Rail Administration had proposed that the line was to be built with the government agency as owner and with either SJ or private railway companies as train operators. However, the Cabinet of Carl Bildt wanted private sector involvement in the construction and operation of the line. In 1993, the Government put in place a public tender to build and operate the line. In 1994, Arlanda Link Consortium was chosen, consisting of the
Nordic Construction Company NCC AB is a Swedish construction company, the second largest in the Nordic region with annual revenues (2020) of 53,9 billion SEK and about 14 500 employees. NCC develops and builds residential and commercial properties, industrial facilitie ...
,
SIAB The Bucharest International Auto Show ( ro, Salonul Internațional de Automobile București, or just ''SIAB'') is an auto show organized every two years in Romania Romania ( ; ro, România ) is a country located at the crossroads of Cent ...
, Vattenfall, GEC-Alsthom and
Mowlem Mowlem was one of the largest construction and civil engineering companies in the United Kingdom. Carillion bought the firm in 2006. History The firm was founded by John Mowlem in 1822, and was continued as a partnership by successive generat ...
. A-Banan Projekt AB was established as a
limited company In a limited company, the liability of members or subscribers of the company is limited to what they have invested or guaranteed to the company. Limited companies may be limited by shares or by guarantee. In a company limited by shares, the lia ...
in 1994 to oversee the project. The consortium established A-Train AB to be the project developer and then operate the Arlanda Express until 2040. The legal responsibility for the project was transferred from the consortium to A-Train in 1995. As part of the agreement, A-Train received from the Swedish Government 850 million Swedish krona (SEK) in a grant and SEK 1 billion in a loan to help finance the project. The company was also allowed to operate a shuttle service from Stockholm C to Arlanda and charge a non-discriminating fee for all other trains using the line. Total investment costs for the project were SEK 6 billion, of which SEK 2 billion was financed through state grants to the Swedish Rail Administration who built the quadruple track along the East Coast Line. The public–private partnership part of the project involved two new tracks at Stockholm C and the Arlanda Line, costing SEK 4.1 billion. Of this, SEK 2.4 billion was financed by the state. In addition, the state held a financial guarantee to
Nordea Nordea Bank Abp, commonly referred to as Nordea, is a European financial services group operating in northern Europe and based in Helsinki, Finland. The name is a blend of the words "Nordic" and "idea". The bank is the result of the successive m ...
for the X3 trains, should A-Train fail to meets its financial obligations to the bank. A-Train was also granted an interest-free deferral on the payment of the fees at Stockholm C and Arlanda, costing the state SEK 90 million. Of A-Train's capital loan for SEK 2.2 billion, SEK 1.8 billion was borrowed from three state-owned financial institutions: the
Swedish National Debt Office The Swedish National Debt Office ( sv, Riksgäldskontoret or shortly ''Riksgälden'') was founded by Gustav III at the Riksdag of the Estates in 1789, through the Act of union and security. It is a Swedish Government agency. The first task of the ...
, the
Swedish Export Credit Corporation The Swedish Export Credit Corporation ( sv, Aktiebolaget Svensk Exportkredit) is a state-owned corporation that serves as an export credit agency. It provides medium- and long-term export credits. It works with the Ministry of Finance A ministry of ...
and the
Nordic Investment Bank The Nordic Investment Bank (NIB) is an international financial institution founded in 1975 by the five Nordic countries (Denmark, Finland, Iceland, Norway, and Sweden). In 2005, the three Baltic states (Estonia, Latvia, and Lithuania) also beca ...
. In addition, 20% of the share capital was secured through Vattenfall's equity in the company. The Arlanda Line and the Arlanda Express started operations on 25 November 1999. After the construction was completed, the ownership of the infrastructure was transferred to A-Banan Projekt. However, A-Train is responsible for paying for all maintenance and operating costs of the line. In 2004, A-Train was bought by Macquarie Group, who paid SEK 70 million for the company, in addition to taking over debt worth SEK 330 million. In 2004, the Swedish National Audit Office criticized the process of building and financing the Arlanda Line, and stated that the State had taken more financial risk than the Riksdag had been informed about. It also criticized the
Government A government is the system or group of people governing an organized community, generally a state. In the case of its broad associative definition, government normally consists of legislature, executive, and judiciary. Government is ...
for giving additional financial support to A-Train in the form of guarantees without informing the Riksdag, and having an unclear management strategy. It also commented that the traffic forecasts during planning were incorrect. The original plans showed an economic benefit of SEK 4 billion. However, because A-Train is free to set its ticket prices as it wishes, the high prices resulted in too few passengers taking the Arlanda Line for it to be of economic benefit to the Swedish community, and the line failed to maximise its economic impact through reduced road congestion and emissions. In 2006, Upptåget started operating on the Arlanda Line. In 2008, A-Banan Projekt changed its name to Arlanda Infrastructure.
Storstockholms Lokaltrafik Storstockholms Lokaltrafik, or more formally Aktiebolaget Storstockholms Lokaltrafik (Greater Stockholm Local Transit Company), is the organisation running all of the land based public transport systems in Stockholm County. It was previously k ...
stated in 2008 that they intended to use the line for a new branch of the Stockholm Commuter Rail. In a motion passed by the Riksdag on the 7 October 2008, the Arlanda Line Agreement was unanimously criticized and characterized as the "worst possible agreement Arlanda could have". A-Train is free to set whatever fees its sees fit on the line, both regarding their own ticket prices on the Arlanda Express and what fees it charges other train operators. This framework had resulted in a significant rise in ticket prices and results in a low levels of public transport use for ground transportation to the airport. The Swedish State holds an option to purchase the traffic rights from A-Train in 2010, which would eliminate the fees and allow other operators to run directly from the airport to the city center. As of 2008, the train had a 9% market share for employees and a 25% market share for passengers traveling to the airport. Commentators and politicians have stated that the business model results in a low utilization of the line because of the high ticket prices, which has caused the airport to not reach its targeted emission goals. The CEO of A-Train, Per Thorstensson, stated that it would be a waste of tax payers' money to purchase the line in 2010, as the state would receive the line free of charge in 2040. Originally A-Train was required to accumulate capital of SEK 600 million before it could pay
dividend A dividend is a distribution of profits by a corporation to its shareholders. When a corporation earns a profit or surplus, it is able to pay a portion of the profit as a dividend to shareholders. Any amount not distributed is taken to be re-i ...
s, but this was changed to SEK 150 million in 2008, after an agreement was made with Arlandabanan Infrastructure.


Organization

The Arlanda Line in its entirety is owned by the state-owned Arlanda Infrastructure, which also owns platforms 1 and 2 at Stockholm C. A-Train holds a monopoly on the right to transport passengers from Stockholm to Arlanda; other train operators only have the right to transport passengers to the airport from other towns and cities. In 2008, the cost of a boarding or embarking passenger at Arlanda C was SEK 75. This results in a ticket from Uppsala to Arlanda costing SEK 136, while a ticket on the same train but traveling onwards to Stockholm C only costs SEK 64. Similarly the cost of a ticket to the airport with the Arlanda Express is considerably higher than that of a ticket to Uppsala, which is twice as far away.