The Yorkshire Electric Power Company was founded in 1901 to provide a supply of electricity to commercial and industrial users throughout the West Riding of Yorkshire, England. It built and operated power stations and constructed overhead electric power lines across an area of 1,800 square miles (4662 km2). The company’s power stations were at Thornhill, Barugh, Ferrybridge and Mexborough. The company promoted and stimulated demand for electric power and it was financially profitable for its shareholders. The Yorkshire Electric Power Company was dissolved in 1948 when the British electricity supply industry was nationalised. Its power stations were vested in the British Electricity Authority and its electricity distribution and sales functions were taken over by the Yorkshire Electricity Board. History In the late 1890s a group of large and influential manufacturing firms in West Yorkshire wished to promote an electric power company to provide a cheap and abundant supply of ...
[...More Info...]      
[...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]  


British Electricity Authority
The British Electricity Authority (BEA) was established as the central British electricity authority in 1948 under the nationalisation of Great Britain's electricity supply industry enacted by the Electricity Act 1947. The BEA was responsible for the generation, transmission and sale of electricity to area electricity boards, and the development and maintenance of an efficient, coordinated and economical system of electricity supply. History The authority took over the operations of over 600 small public supply power companies, municipal authority electricity departments and the Central Electricity Board to form the BEA, which comprised a central authority and 14 area boards. Its scope did not include control of the North of Scotland Hydro-Electric Board, which had been founded in 1943 and remained independent of the BEA. The appointment of chairmen and members of the BEA and the area boards were made in August 1947 and the BEA was formally established on 15 August 1947. The ...
[...More Info...]      
[...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]  


picture info

National Grid (Great Britain)
In the electricity sector in the United Kingdom, the National Grid is the high-voltage electric power transmission network serving Great Britain, connecting power stations and major substations and ensuring that electricity generated anywhere on it can be used to satisfy demand elsewhere. The network covers the great majority of Great Britain and several of the surrounding islands. It does not cover Northern Ireland, which is part of a single electricity market with the Republic of Ireland. The GB grid is connected as a wide area synchronous grid nominally running at 50 hertz. There are also undersea interconnections to other grids in the Isle of Man, Northern Ireland, the Republic of Ireland, France, Belgium, the Netherlands and Norway. On the breakup of the Central Electricity Generating Board in 1990, the ownership and operation of the National Grid in England and Wales passed to National Grid Company plc, later to become National Grid Transco, and now National Grid plc. In ...
[...More Info...]      
[...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]  


picture info

Electric Power Companies Of England
Electricity is the set of physical phenomena associated with the presence and motion of matter that has a property of electric charge. Electricity is related to magnetism, both being part of the phenomenon of electromagnetism, as described by Maxwell's equations. Various common phenomena are related to electricity, including lightning, static electricity, electric heating, electric discharges and many others. The presence of an electric charge, which can be either positive or negative, produces an electric field. The movement of electric charges is an electric current and produces a magnetic field. When a charge is placed in a location with a non-zero electric field, a force will act on it. The magnitude of this force is given by Coulomb's law. If the charge moves, the electric field would be doing work on the electric charge. Thus we can speak of electric potential at a certain point in space, which is equal to the work done by an external agent in carrying a unit of positiv ...
[...More Info...]      
[...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]  


Defunct Electric Power Companies Of The United Kingdom
Defunct (no longer in use or active) may refer to: * ''Defunct'' (video game), 2014 * Zombie process or defunct process, in Unix-like operating systems See also * * :Former entities * End-of-life product * Obsolescence Obsolescence is the state of being which occurs when an object, service, or practice is no longer maintained or required even though it may still be in good working order. It usually happens when something that is more efficient or less risky r ...
{{Disambiguation ...
[...More Info...]      
[...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]  


London Power Company
The London Power Company was an electricity generating and bulk supply company in London, England, formed in 1925 by the merger of ten small electricity companies. In 1948 Britain's electricity supply industry was nationalised under the Electricity Act 1947 and the company was absorbed into the British Electricity Authority. Legislation The London Power Company originated in the ''London Electricity Joint Committee (1920) Limited,'' established in January 1920, which aimed to secure cooperation between London's electricity companies. The company promoted the ''London Electricity (No.2) Act 1925'' which empowered electricity companies to amalgamate. It also regulated their dividends, required funds to be set up to transfer the companies' assets to the London and Home Counties Joint Electricity Authority, required companies to notify the authority of any proposal to spend capital exceeding £5,000, to dispose of any electricity generated in excess of that obligated to customers, ...
[...More Info...]      
[...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]  


picture info

Central Electricity Generating Board
The Central Electricity Generating Board (CEGB) was responsible for electricity generation, transmission and bulk sales in England and Wales from 1958 until privatisation of the electricity industry in the 1990s. It was established on 1 January 1958 to assume the functions of the Central Electricity Authority (1955–7), which had in turn replaced the British Electricity Authority (1948–55). The Electricity Council was also established in January 1958, as the coordinating and policy-making body for the British electricity supply industry. Responsibilities The CEGB was responsible for electricity generation, transmission and bulk sales in England and Wales, whilst in Scotland electricity generation was carried out by the South of Scotland Electricity Board and the North of Scotland Hydro-Electric Board. The CEGB's duty was to develop and maintain an efficient, coordinated and economical system of supply of electricity in bulk for England and Wales, and for that purpose to ...
[...More Info...]      
[...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]  




Central Electricity Authority
The Central Electricity Authority (CEA) was a body that managed and operated the electricity supply industry in England and Wales between 1 April 1955 and 31 December 1957. The CEA replaced the earlier British Electricity Authority (BEA) as a result of the Electricity Reorganisation (Scotland) Act 1954, which moved responsibility for Scottish electricity supply to the Scottish Office. Structure The structure of the management board and the personnel in post remained the same as the BEA with the exception of the removal of representation by the chairman of the North of Scotland Hydro-Electric Board. There was a reduction from 14 to 12 of the number of area electricity boards – the South East Scotland Electricity Board and South West Scotland Electricity Board were removed from the CEA's management. The functions of the remaining area boards were unchanged. Upon its establishment in April 1955 the chairman of the CEA was Lord Citrine; the two deputy chairmen were Sir Henry ...
[...More Info...]      
[...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]  


Nationalization
Nationalization (nationalisation in British English) is the process of transforming privately-owned assets into public assets by bringing them under the public ownership of a national government or state. Nationalization usually refers to private assets or to assets owned by lower levels of government (such as municipalities) being transferred to the state. Nationalization contrasts with privatization and with demutualization. When previously nationalized assets are privatized and subsequently returned to public ownership at a later stage, they are said to have undergone renationalization. Industries often subject to nationalization include the commanding heights of the economy – telecommunications, electric power, fossil fuels, railways, airlines, iron ore, media, postal services, banks, and water – though, in many jurisdictions, many such entities have no history of private ownership. Nationalization may occur with or without financial compensation to the former owners. ...
[...More Info...]      
[...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]  


picture info

Cooling Pond
A cooling pond is a man-made body of water primarily formed for the purpose of cooling heated water and/or to store and supply cooling water to a nearby power plant or industrial facility such as a petroleum refinery, pulp and paper mill, chemical plant, steel mill or smelter. Overview Cooling ponds are used where sufficient land is available, as an alternative to cooling towers or discharging of heated water to a nearby river or coastal bay, a process known as “once-through cooling.” The latter process can cause thermal pollution of the receiving waters. Cooling ponds are also sometimes used with air conditioning systems in large buildings as an alternative to cooling towers. The pond receives thermal energy in the water from the plant’s condensers during the process of energy production and the thermal energy is then dissipated mainly through evaporation and convection. Once the water has cooled in the pond, it is reused by the plant. New water is added to the system ...
[...More Info...]      
[...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]  


picture info

West Riding Of Yorkshire
The West Riding of Yorkshire is one of three historic subdivisions of Yorkshire, England. From 1889 to 1974 the administrative county County of York, West Riding (the area under the control of West Riding County Council), abbreviated County of York (WR), was based closely on the historic boundaries. The lieutenancy at that time included the City of York and as such was named West Riding of the County of York and the County of the City of York. Its boundaries roughly correspond to the present ceremonial counties of West Yorkshire, South Yorkshire and the Craven, Harrogate and Selby districts of North Yorkshire, along with smaller parts in Lancashire (for example, the parishes of Barnoldswick, Bracewell, Brogden and Salterforth became part of the Pendle district of Lancashire and the parishes of Great Mitton, Newsholme and Bowland Forest Low became part of the Ribble Valley district also in Lancashire), Cumbria, Greater Manchester and, since 1996, the unitary East Riding of ...
[...More Info...]      
[...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]  


Mexborough Power Station
Mexborough Power Station was a coal-fired power station situated on the banks of the River Don, on the border of Mexborough and Denaby, adjoining Doncaster Road, in South Yorkshire, England. History The plant was planned by the '' Yorkshire Electric Power Company'' in 1939 but construction was delayed by the war. The station became operational in 1945. Plant The site housed four English Electric generating sets of approximately 30 MW each, giving the station a total generating capacity of 120 megawatts (MW). Two of the sets were installed in January to September 1945 and generated at 10.5 kV, and the other two were installed in July to September 1957 and generated at 11.8 kV. There were four Mitchell stoker-fired boilers and four Richardson Westgarth boilers. The boilers had the combined capacity to produce 1,260,000 lb/h (158.8 kg/s) of steam at 600 psi (41.4 bar) and 454 °C. There were four substantial chimneys giving this local landmark its dis ...
[...More Info...]      
[...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]  


picture info

Ferrybridge Power Stations
The Ferrybridge power stations were a series of three coal-fired power stations on the River Aire near Ferrybridge in West Yorkshire, England, in operation from 1927 to 2016 on a site next to the junction of the M62 and A1(M) motorways. The first station, Ferrybridge A, was constructed in the mid-1920s and closed in 1976. Ferrybridge B was brought into operation in the 1950s and closed in the early 1990s. In 1966, Ferrybridge C power station was opened with a generating capacity of 2 GW from four 500 MW sets; constructed by the Central Electricity Generating Board (CEGB); on privatisation in 1989 ownership was passed to Powergen, then to Edison Mission Energy (1999), then to AEP Energy Services (American Electric Power) (2001) and to SSE plc (2004). Ferrybridge C closed in March 2016. Two of the four units were fitted with flue-gas desulphurisation (FGD) plant in 2009. In 2013 SSE indicated that the power station would not comply with the Industrial Emissions Direc ...