New York And Brooklyn Bridge Railway
   HOME
*



picture info

New York And Brooklyn Bridge Railway
From 1898 to 1950, various companies operated local trolley lines over the Brooklyn Bridge, taking passengers from many points in Brooklyn and Queens, New York City, United States to the Park Row (BMT station), Park Row terminal in Lower Manhattan. These lines entered the bridge roadway from Fulton Street (Brooklyn), Fulton Street or Sands Street in Downtown Brooklyn, some of them using elevated trackage at the Sands Street (BMT station), Sands Street elevated railway station. History Initially, all lines reached the bridge by way of the Brooklyn Heights Railroad's Graham Avenue Line tracks in Sands Street. Cars could enter Sands Street to the west at Fulton Street (Brooklyn), Fulton Street (many Brooklyn Heights lines) or to the east at Washington Street (Coney Island and Brooklyn Railroad's DeKalb Avenue Line) or Adams Street (Nassau Electric Railroad's Adams Street and Boerum Place Line). From Washington Street, tracks ran east on High Street to the CI&B's Smith Street Line (s ...
[...More Info...]      
[...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]  


picture info

New York And Brooklyn Bridge (1883) - Plate 7
The Brooklyn Bridge is a hybrid Cable-stayed bridge, cable-stayed/suspension bridge in New York City, spanning the East River between the boroughs of Manhattan and Brooklyn. Opened on May 24, 1883, the Brooklyn Bridge was the first fixed crossing of the East River. It was also the List of longest suspension bridge spans#History of longest suspension spans, longest suspension bridge in the world at the time of its opening, with a main span of and a deck above Mean High Water, mean high water. The span was originally called the New York and Brooklyn Bridge or the East River Bridge but was officially renamed the Brooklyn Bridge in 1915. Proposals for a bridge connecting Manhattan and Brooklyn were first made in the early 19th century, which eventually led to the construction of the current span, designed by John A. Roebling. The project's chief engineer, his son Washington Roebling, contributed further design work, assisted by the latter's wife, Emily Warren Roebling. Constructio ...
[...More Info...]      
[...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]  



MORE