Greenwich Line
   HOME
*



picture info

Greenwich Line
The Greenwich line is a short railway line in South London that follows part of the route of the London and Greenwich Railway, which was the first railway line in London. The line diverges from the South Eastern Main Line at North Kent East junction and runs as far as Charlton junction where it connects with the North Kent Line. Stations * * * * History The line was electrified with the other SE&CR local routes to Dartford on 6 June 1926 by Southern Railway. From 12 January 2015, services using the Greenwich line were no longer able to serve London Charing Cross. This is due to the Thameslink Programme work, which removed the diamond crossing at Spa Road Junction, located between London Bridge and Deptford. As a result of this, trains using the Greenwich line could no longer reach the lines going into Charing Cross. To compensate for the loss of this, London Cannon Street was given revised service times, with it being open seven days a week and until the end of service. ...
[...More Info...]      
[...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]  


picture info

Southeastern (train Operating Company)
SE Trains Limited, trading as Southeastern, is a train operator, owned by DfT OLR Holdings for the Department for Transport, that took over operating the South Eastern franchise in South East England from privately owned London & South Eastern Railway (which also traded as Southeastern) on 17 October 2021. History In September 2021, the Department for Transport announced it would be terminating the South Eastern franchise operated by Govia Govia is a transport company based in the United Kingdom. It was formed in November 1996 as a joint venture between Go-Ahead Group (65%) and Keolis (35%) to bid for rail franchises during the privatisation of British Rail. History Establi ...-owned Southeastern (train operating company 2006–2021), Southeastern after revenue declaration discrepancies involving £25million of public money were discovered. SE Trains, as an operator of last resort, took over the franchise on 17 October 2021, for a three-year period until October 2 ...
[...More Info...]      
[...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]  


picture info

Greenwich Line
The Greenwich line is a short railway line in South London that follows part of the route of the London and Greenwich Railway, which was the first railway line in London. The line diverges from the South Eastern Main Line at North Kent East junction and runs as far as Charlton junction where it connects with the North Kent Line. Stations * * * * History The line was electrified with the other SE&CR local routes to Dartford on 6 June 1926 by Southern Railway. From 12 January 2015, services using the Greenwich line were no longer able to serve London Charing Cross. This is due to the Thameslink Programme work, which removed the diamond crossing at Spa Road Junction, located between London Bridge and Deptford. As a result of this, trains using the Greenwich line could no longer reach the lines going into Charing Cross. To compensate for the loss of this, London Cannon Street was given revised service times, with it being open seven days a week and until the end of service. ...
[...More Info...]      
[...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]  


picture info

London Cannon Street
Cannon Street station, also known as London Cannon Street, is a central London railway terminus and connected London Underground station in Travelcard zone 1 located on Cannon Street in the City of London and managed by Network Rail. It is one of two London termini of the South Eastern Main Line, the other being , while the Underground station is on the Circle and District lines, between Monument and Mansion House. The station runs services by Southeastern, mostly catering for commuters in southeast London and Kent, with occasional services further into the latter. The station was built on a site of the medieval steelyard, the trading base in England of the Hanseatic League. It was built by the South Eastern Railway in order to have a railway terminal in the City and compete with the rival London, Chatham and Dover Railway. This required a new bridge across the River Thames, which was constructed between 1863 and 1866. The station was initially a stop for continental serv ...
[...More Info...]      
[...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]  




Level Junction
A level junction (or in the United Kingdom a flat crossing) is a railway junction that has a track configuration in which merging or crossing railroad lines provide track connections with each other that require trains to cross over in front of opposing traffic at grade (i.e. on the level). The cross-over structure is sometimes called a diamond junction or diamond crossing in reference to the diamond-shaped center. The two tracks need not necessarily be of the same gauge. A diamond crossing is also used as a component of a double junction, like the one illustrated on the right. The opposite of a level junction is a flying junction, where individual tracks rise or fall to pass over or under other tracks. Risks Conflicting routes must be controlled by interlocked signals to prevent collisions. Level junctions, particularly those of fine angles or near right angles, create derailment risks and impose speed restrictions. The former can occur as the flanges of the wheels are m ...
[...More Info...]      
[...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]  


picture info

Thameslink Programme
The Thameslink Programme, originally Thameslink 2000, was a £6billion project in south-east England to upgrade and expand the Thameslink rail network to provide new and longer trains between a wider range of stations to the north and to the south of London. The development facilitated new cross-London journeys, which means that passengers no longer have to change trains in London. Work included platform lengthening, station remodelling, new railway infrastructure, and new rolling stock. The project was originally proposed in 1991 following the successful introduction of the initial Thameslink service in 1988. After many delays, planning permission was granted in 2006 and funding was approved in October 2007. Work started in 2009 and was completed on 18 September 2020, although trains over the new routes began running in 2018. Planning Background The original Thameslink rail network was created by joining the electrified network south of the Thames with the then recently ...
[...More Info...]      
[...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]  


picture info

Charing Cross Railway Station
Charing Cross railway station (also known as London Charing Cross) is a central London railway terminus between the Strand and Hungerford Bridge in the City of Westminster. It is the terminus of the South Eastern Main Line to Dover via Ashford. All trains are operated by Southeastern, which provides the majority of commuter and regional services to south-east London and Kent. It is connected to Charing Cross Underground station and is near to Embankment Underground station and Embankment Pier. The station was originally opened by the South Eastern Railway in 1864. It takes its name from its proximity to the road junction Charing Cross, the notional "centre of London" from which distances from the city are measured. During the 19th century the station became the main London terminus for continental traffic via boat trains, and served several prestigious international services. It was badly damaged by an engineering accident in 1905 and extensively rebuilt, subsequently beco ...
[...More Info...]      
[...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]  


picture info

Southern Railway (UK)
The Southern Railway (SR), sometimes shortened to 'Southern', was a British railway company established in the 1923 Grouping. It linked London with the Channel ports, South West England, South coast resorts and Kent. The railway was formed by the amalgamation of several smaller railway companies, the largest of which were the London and South Western Railway (LSWR), the London, Brighton and South Coast Railway (LB&SCR) and the South Eastern and Chatham Railway (SE&CR).Bonavia (1987) pp. 26-28 The construction of what was to become the Southern Railway began in 1838 with the opening of the London and Southampton Railway, which was renamed the London & South Western Railway. The railway was noted for its astute use of public relations and a coherent management structure headed by Sir Herbert Walker. At , the Southern Railway was the smallest of the '' Big Four'' railway companies and, unlike the others, the majority of its revenue came from passenger traffic rather than freight ...
[...More Info...]      
[...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]  


picture info

South Eastern And Chatham Railway
The South Eastern and Chatham Railway Companies Joint Management Committee (SE&CRCJMC),Awdry (1990), page 199 known as the South Eastern and Chatham Railway (SE&CR), was a working union of two neighbouring rival railways, the South Eastern Railway (UK), South Eastern Railway (SER) and London, Chatham and Dover Railway (LC&DR), which operated between London and south-east England. Between 1899 and 1923, the SE&CR had a monopoly of railway services in Kent and to the main English Channel, Channel ports for ferries to France and Belgium. The companies had competed extensively, with some of the bitterest conflicts between British railway companies. Competing routes to the same destinations were built, so several towns in Kent had been served with a similar frequency service by both companies. In places, unfettered competition allowed two stations and services to multiple London termini. It would be a constituent of the Southern Railway (UK), Southern Railway as part o ...
[...More Info...]      
[...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]  


picture info

Railway Electrification In Great Britain
Railway electrification in Great Britain began in the late 19th century. A range of voltages has been used, employing both overhead lines and conductor rails. The two most common systems are using overhead lines, and the third rail system used in Southeast England and on Merseyrail. As of March 2020, (38%) of the British Rail transport in Great Britain, rail network was Railway electrification system, electrified. According to Network Rail, as at 2003, 64% of the electrified network used the 25kVAC overhead system, and 36% used the 660/750VDC third-rail system.Network Rail, 2003 Technical Plan, Chapter 11 "Network Capability", page 7 "Electrification". "Approximately 40% of the rail network is currently equipped with electrification." From page 1, total network is 30764 km, 7587 km of 25 kV AC, 4285 km of 650/750 V DC and 28 km of 1500 V DC. Excludes CTRL, LUL, Old Danby test track, bulk of Tyne and Wear Metro, etc. NB it does not state what method of counting length of netw ...
[...More Info...]      
[...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]  


picture info

Bricklayers Arms & New Cross, Midhurst RJD 91
A bricklayer, which is related to but different from a mason, is a craftsman and tradesman who lays bricks to construct brickwork. The terms also refer to personnel who use blocks to construct blockwork walls and other forms of masonry. In British and Australian English, a bricklayer is colloquially known as a "brickie". A stone mason is one who lays any combination of stones, cinder blocks, and bricks in construction of building walls and other works. Bricklaying is a part of masonry. Bricklaying may also be enjoyed as a hobby. For example, the former British Prime Minister Winston Churchill did bricklaying as a hobby. Bricklayers occasionally enter competitions where both speed and accuracy are judged. The largest is the "Spec-Mix Bricklayer 500" held annually in Las Vegas, Nevada, USA. Required training Bricklaying and masonry are ancient professions that even centuries later require modern training. Bricklayers usually go through a formal apprenticeship which includ ...
[...More Info...]      
[...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]  


picture info

North Kent Line
The North Kent Line is a railway line which branches off the South East Main Line at St Johns junction west of Lewisham station in Greater London and runs to Rochester Bridge Junction near Strood, Medway where it links to the Chatham Main Line. The section from Charlton to Dartford is also referred to as the "Woolwich Line" in the context of Southeastern Metro services. History Construction The North Kent Line was the means by which the South Eastern Railway (SER) was able to connect its system to London at London Bridge. In 1846 the SER purchased the Thames and Medway Canal tunnel near Higham and laid railway tracks through it; in 1847 trains were working through from the Strood terminus, on the River Medway to Gravesend. From 30 July 1849 the line was extended, via Blackheath, to a junction with the London and Greenwich Railway at North Kent East Junction, near Deptford, and through trains were now able to operate. Electrification The line is electrified (750 V DC third ...
[...More Info...]      
[...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]  


picture info

South Eastern Main Line
The South Eastern Main Line is a major long-distance railway route in South East England, UK, one of the three main routes crossing the county of Kent, going via Sevenoaks, Tonbridge, Ashford and Folkestone to Dover. The other routes are the Chatham Main Line which runs along the north Kent coast to Ramsgate or Dover via Chatham and High Speed 1 which runs through the centre of Kent to the coast at Folkestone where it joins the Channel Tunnel. History Construction The line was built by the South Eastern Railway (SER), which was in competition with the London, Chatham and Dover Railway (LCDR), hence the duplication of routes in Kent. The original main line was given sanction by Act of Parliament in 1836. The route first authorised was from via Oxted, Tunbridge, Maidstone, Ashford and Folkestone. The route was to make use of the existing London and Croydon Railway and London and Greenwich Railway companies' tracks. The SER did not have much spare capital. As a cost-cutt ...
[...More Info...]      
[...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]