Luas Green Line Stops In Dún Laoghaire–Rathdown
   HOME



picture info

Luas Green Line Stops In Dún Laoghaire–Rathdown
Luas (, Irish: ; meaning 'speed') is a tram system in Dublin, Ireland. There are two main lines: the Green Line, which began operating on 30 June 2004, and the Red Line which opened on 26 September 2004. Since then, the red line has been extended and split into different branches further out of the city and the green line has been extended north and south as a single line. Since the northern extension of the green line in 2017, the two lines intersect in the city centre. The system now has 67 stops and of revenue track, which in 2023 carried 48.2 million passengers, an increase of 24% compared to 2022. Luas is operated by Transdev, under tender from Transport Infrastructure Ireland (TII). (Prior to the later RPA merger with the National Roads Authority to form TII, the tender was originally under the defunct Railway Procurement Agency jurisdiction). The Luas was a major part of the National Transport Authority's strategy (2000–2016). Four extensions to the initial ...
[...More Info...]      
[...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]  


picture info

Red Line (Luas)
The Red Line () is one of the two lines of Dublin's Luas light rail system. The Red Line runs in an east–west direction through the city centre, north of the River Liffey, before travelling southwest to Tallaght, with a fork to Citywest and Saggart. The Red Line opened on 26 September 2004. History Construction work began in March 2001 on the Tallaght to Connolly line, as well as the Sandyford to St. Stephen's Green section of the second line, with Gio. Ansaldo & C., Ansaldo of Italy and MVM of Australia getting the contract to build the system. The St. Stephen's Green to Dublin Airport section was dropped before construction began, as it was decided to serve the area by a MetroLink (Dublin), metro instead. The contract to maintain operate the system was awarded to Transdev Ireland (formerly known as Connex). The extension from Connolly to The Point opened in 2009, with the extension from Belgard to Saggart opening in 2011. Interchange with the Green Line began in December 2 ...
[...More Info...]      
[...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]  



MORE